- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
- PAGE i -SUPPLIER SHIPPING AND DELIVERY PERFORMANCE REQUIREMENTS
SUPPLIER SHIPPING AND DELIVERY PERFORMANCE REQUIREMENTS
PAGE i
GM-1797
Revised 10-89
FOREWORD
The “Supplier Shipping and Delivery Performance Requirements” attachment supplements the “Targets for Excellence” process.
It is the intent of this publication to:
Establish uniform supplier shipping and delivery performance requirements among all GM production, component, and service part facilities.
And
Ensure consistent communication of supplier shipping and delivery requirements to all General Motors' production and service part suppliers.
This publication describes in detail actions a supplier must take to meet General Motors' performance requirements in the areas of:
Plant Capacity
Customer Schedules
Shipping
Data Transfer
These requirements reflect General Motors' commitment to the continuous improvement of product delivery. The identification and communication of uniform shipping and delivery requirements is an on-going initiative designed to support a mutually managed relationship between General Motors and its suppliers.
TABLE OF CONTENTS
Foreword ii
1.0. Plant Capacity 1
A. Tooling Capacity 1
B. Demand Flexibility 1
2.0. Customer Schedules 1
A. Material Schedules 1
B. Supplier Downtime Coverage 2
C. Obsolescence 2
D. Records Maintenance 2
E. Engineering Changes 3
3.0. Shipping 3
A. Pick-up and Delivery Windows 3
B. Premium Transportation 3
C. Routing installations 3
D. Shipping Documents 4
4.0 Data Transfer 4
A. Electronic Communications 4
B. Supplier Communications 5
Delivery PR/R 6
Glossary 7
1.0. PLANT CAPACITY
A supplier is required to achieve a facility and tooling utilization level that can support to General Motors' production and service schedules.
A. TOOLING CAPACITY
1.1A. The supplier shall have the tooling capacity to meet production and service forecasts on straight time. If not specifically noted otherwise, at straight time: a day equals 16 hours, a calendar we
您可能关注的文档
- 2015学年度广州市初中信息技术结业考试正式题(理论部分).docx
- 2015扬州市中考物理试卷分析(江都区).doc
- 2015幼儿数学教育活动设计与指导(劳动第二版)课件.ppt
- 2015肿瘤的分子检测及靶向治疗.ppt
- 2016高考语文(新课标人教版)一轮总复习课件第五编第一章新材料作文专题二.ppt
- 2016高考语文(新课标人教版)一轮总复习课件第五编第一章新材料作文专题一.ppt
- 2016高中数学高一平面向量优秀课件.ppt
- 2016计算机组装与维护(职教版)授课教案计算机的维护.doc
- 2016经济学基础(高教版 石海燕编)课件第二章第二节 货币.ppt
- 2016礼仪规范教程(梁新主编。航空工业版)教案第一章 礼仪引论.doc
文档评论(0)