PowerGen Asia, Bangkok, Thailand October 2 – 4, 2013
Life Cycle Value for combined cycle power
plants
Thomas Bierdel, Siemens AG, Senior Sales Director GT Power Plants Solutions, North Asia, Japan
Patrick Bullinger, Siemens AG, Product Line Marketing Solutions
Thomas Hagedorn, Siemens AG, VP GT Power Plant Solutions ASIA
Copyright © Siemens AG, 2013. All rights reserved.
0. Abstract
The Siemens Energy Sector is the worlds leading supplier of a complete spectrum of products,
services and solutions for power generation in combined cycle power plants. Siemens combined
cycle (SCC®) reference power plants (RPP) provide flexibility for easy selection of options to
meet specific site and customer needs. This, together with a pre-designed balance of plant, results
in short project lead times. It provides an optimum balance between capital cost, plant
performance, and operational and maintenance considerations.
The financing schedule for the life time of a combined cycle power plant is essential. It has to be
considered during the EPC phase, the OM period, etc. However the cash flow will be affected
by several factors during EPC (e.g. optimized planning time will reduce the construction
commissioning time costs) and OM (e.g. fuel, service replacement parts) phase as well as
book life of equipment, domestic taxes, tax and equipment depreciation, interest rates and
discount rates etc.
In respect to the operation of a high efficiency and complex combined cycle power plant, the
costs for unscheduled maintenance are crucial. These unexpected downtimes could lead to lost of
revenues and/or penalties according to the Power Purchase Agreement (PPA).
Therefore a continuously remote operating diagnostic system, which needs to be supported by the
OEM engineering organization, for preventive ma
您可能关注的文档
- 04精益班组长育成-生产.pdf
- 05精益班组长育成-设备.pdf
- 08精益班组长育成-环境.pdf
- 操作员工标准化作业培训【数字化企业 微信分享】.pdf
- 8000H系列燃气轮机产品满足中东地区能源需求.pdf
- H级电站的最新运行经验,包括韩国的第一个商用机组Dangjin3.pdf
- SGT-800燃气轮机持续可用性和维修性改进.pdf
- SGT-8000H系列燃气轮机及其在欧洲电力市场的优势.pdf
- SGT-A05 (Industrial 501) 航改型燃气轮机.pdf
- 采取防爆措施,降低风险.pdf
- 2025年全国演出经纪人员资格认定考试试卷带答案(研优卷).docx
- 2025年全国演出经纪人员资格认定考试试卷完整版.docx
- 2025年全国演出经纪人员资格认定考试试题库及完整答案.docx
- 2025年全国演出经纪人员资格认定考试试卷完美版.docx
- 2025年全国演出经纪人员资格认定考试试卷含答案(实用).docx
- 2025年全国演出经纪人员资格认定考试试卷及答案(各地真题).docx
- 2025年下半年内江市部分事业单位公开考试招聘工作人员(240人)备考题库附答案.docx
- 2025年全国演出经纪人员资格认定考试试卷及答案1套.docx
- 2025年下半年四川成都市郫都区面向社会引进公共类事业单位人员2人备考题库最新.docx
- 2025年下半年内江市部分事业单位公开考试招聘工作人员(240人)备考题库附答案.docx
原创力文档

文档评论(0)