- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
* * * Slide intent: Presentation/Family introduction. Notes for the presenter: 20 minute presentation. InfraStruXure CDU family is part of InfrastruXure Cooling Solutions for medium to large data center applications InfrastruXure CDU provides distribution and management of cooling fluid. Modular construction allows flexibility and adaptability The scalable design of the InfraStruXure CDU enables customers to meet the changing needs of their environments. * One inch diameter pex-Al-pex with crimped connection unions. Pipes will be a standard APC sku. Makes addition of future IR17 units easy. * Slide intent: Provide overview of the Product Family design and main feature/benefits Notes for the presenter: Direction: Clockwise beginning with the Isolation and Balancing Valve Opening Comments Easy to install (or move if required) since it ships pre-configured with circuit isolation valves Water or Glycol, 1 to 12 InRow RC support, Top or Bottom Piping Configuration. Isolation and Balancing Valve: These valves allow individual circuit isolation and provide a means to balance the flow of fluid to multiple CRAC units. Main Supply and Return Headers: Provides a point of connection fo the main supply and return lines to and from the chiller. Pre-configured with 12 distribution lines, which allows scalability from 1 to 12 In-Row RC’s Individual Supply and Return Lines: Individual lines that allow for independent fluid circuiting for each CRAC. These lines provide the last point of connection between the CDU and the CRAC to reduce the risk of leaks within the datacenter. Top or Bottom Piping Connections The main supply and return connections provide the customer with the flexibility to install the piping from the chiller without the concern of the CDU connections The individual supply and return connections can be configured for top or bottom piping, Note: The individual supply and return connection location must be defined when the order is placed. * (Note: for less ex
文档评论(0)