滑坡应急治理充气截水方法.pdf

32 2 Vol.32 Supp.2 2013 7 Chinese Journal of Rock Mechanics and Engineering July 2013 1 2 1 2 2 (1. 310058 2. 310058) P 642.2 A 2013)2395407 METHOD OF INTERCEPTING WATER BY FILLING SOIL WITH AIR IN EMERGENCY TREATMENT ENGINEERING OF LANDSLIDE 1 2 1 2 2 DU Lili SUN Hongyue SHANG Yuequan LIU Changdian KANG Jianwei (1. College of Civil Engineering and ArchitectureZhejiang UniversityHangzhou Zhejiang310058China 2. Deparment of Ocean Science and Engineering Zhejiang UniversityHangzhou Zhejiang310058China) Abstract Most of landslide′s catchment area is on the trailing edge of slopeand the key factor leading to rise of groundwater level is infiltration of underground water on the trailing edge. The theory of displacing water with air is analyzed. And the hydraulic conductivity will decrease with the decrease in degree of soil saturation. Therefore the concept is put forward that water stoppage curtain of unsaturated soil area with compressed air is formed on seepage path. The test results prove the validity of intercepting water by using numerical simulation and physical model test. Key words slope engineering landslide underground water displacing water with compressed air unsaturated soil numerical simulation physical model 80% 1 55% [1]

文档评论(0)

1亿VIP精品文档

相关文档