- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
为搞好山东省交通科学研究所研发基地项目的结算审计工作,我跟踪审计部特针对本项目作如下要求,请各施工单位、供货单位遵照执行:and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-
您可能关注的文档
- 2019年超市生鲜主管每日周月工作安排.doc
- 2019年超市食品部、百货部主管岗位职责.doc
- 2019年超市收银主管工作职责.doc
- 2019年超星尔雅国学智慧期末考试完整答案.doc
- 2019年车队各岗位职责及安全操作规程.doc
- 2019年车队主管竞聘书.doc
- 2019年车间6S管理标准化.doc
- 2019年车间管理规定.doc
- 2019年车间节能减排管理办法.doc
- 2019年车间人文关怀、心理疏导做法.doc
- 2026年新疆师范大学辅导员招聘备考题库最新.docx
- 2026年上海立达学院辅导员招聘备考题库最新.docx
- 2025年长城铝业公司职工工学院辅导员招聘备考题库附答案.docx
- 2025年重庆应用技术职业学院辅导员考试笔试真题汇编附答案.docx
- 2025年香港中文大学(深圳)辅导员招聘考试真题汇编最新.docx
- 2025年闽南科技学院辅导员考试笔试真题汇编附答案.docx
- 2025年青岛大学辅导员招聘考试真题汇编附答案.docx
- 2025年长春早期教育职业学院辅导员考试笔试真题汇编最新.docx
- 2026年东北农业大学辅导员招聘备考题库最新.docx
- 2025年陕西学前师范学院辅导员考试笔试题库最新.docx
原创力文档


文档评论(0)