- 5
- 0
- 约4.55千字
- 约 21页
- 2019-09-06 发布于江西
- 举报
* * * * * * * * * * Lecture Lecture Management Science:Operations Research(OR) Chapter 10 INVENTORY MODELS * * Lecture 10.1 Basic Concepts in Inventory Planning Our inventory models will concern just a single item for which the demand per period (year) is D units.? The number of items in stock is depleted over time by the demand, but also increased from time to time by instantaneous additions Q called orders, resulting in sudden jumps in the inventory level. * Lecture * The time between two consecutive replenishments is the inventory cycle length tc. ? The lead time tL is the time between the placement and arrival of an order * Lecture * Order size Q and the lead time tL will usually be the same for all orders. The cost for carrying one unit of inventory for one period is called the unit carrying or holding cost ch. Ordering cost co is the cost of placing an order and having it delivered, considered independent of the size of the order. * Lecture * For some inventory models, backorders are not allowed, otherwise the unit shortage cost cs is the cost charged to be out of stock by one unit for one period of time. * Lecture * 10.2 The Economic Order Quantity (EOQ) Model Assumptions of the basic EOQ model are: Inventory is single unperishable good, the demand rate is constant over time, the same amount is ordered each time, there are no quantity discounts, stockouts are not allowed, the planning horizon is infinite. * Lecture * The famous sawtooth pattern is shown in the figure below. * Lecture * Ordering costs if we place N orders, each of size Q, the total amount ordered is NQ = D the number of orders per period(year) N = D/Q total annual ordering costs coN = coD/Q. * Lecture * Holding cost For holding cost, we compute the total area under the sawtooth curve, which can be seen to be ?Q, so that the total annual holding cost is ch(?Q). * Lecture * Total inventory cost The total inventory costs TC per period are TC = coD/Q
您可能关注的文档
- GDT 福特汽车形位公差培训资料.ppt
- 2013高中英语名词性从句在写作中的应用.ppt
- 2013蛇年晚会动态PPT.ppt
- HZS120混凝土搅拌机安装方案.doc
- 2012小学教师继续教育工作个人总结.doc
- flash制作凸透镜成像的详细步骤.doc
- matlab游戏编程实例(黑白棋).doc
- XX县关于公务用车问题情况报告.doc
- 16万m3全容式LNG低温储罐施工方案.doc
- 2013高三作文素材高考作文素材运用技巧例说.doc
- 中国国家标准 GB/Z 37551.300-2026海洋能 波浪能、潮流能及其他水流能转换装置 第300部分:河流能转换装置发电性能评估.pdf
- GB/T 44937.3-2025集成电路 电磁发射测量 第3部分:辐射发射测量 表面扫描法.pdf
- 中国国家标准 GB/T 44937.3-2025集成电路 电磁发射测量 第3部分:辐射发射测量 表面扫描法.pdf
- 《GB/T 44937.3-2025集成电路 电磁发射测量 第3部分:辐射发射测量 表面扫描法》.pdf
- 中国国家标准 GB/T 44937.1-2025集成电路 电磁发射测量 第1部分:通用条件和定义.pdf
- GB/T 44937.1-2025集成电路 电磁发射测量 第1部分:通用条件和定义.pdf
- 《GB/T 44937.1-2025集成电路 电磁发射测量 第1部分:通用条件和定义》.pdf
- 中国国家标准 GB/T 4937.37-2025半导体器件 机械和气候试验方法 第37部分:采用加速度计的板级跌落试验方法.pdf
- 《GB/T 4937.10-2025半导体器件 机械和气候试验方法 第10部分:机械冲击 器件和组件》.pdf
- 中国国家标准 GB/T 44937.2-2025集成电路 电磁发射测量 第2部分:辐射发射测量TEM小室和宽带TEM小室法.pdf
原创力文档

文档评论(0)