- 39
- 0
- 约5.62千字
- 约 23页
- 2019-10-10 发布于江西
- 举报
Copyright ? ESI Group, 2009. All rights reserved. Copyright ? ESI Group, 2009. All rights reserved. Copyright ? ESI Group, 2009. All rights reserved. Getting started with ProCAST (Low Pressure Die Casting set up) Getting started with ProCASTOutlines The goal of this tutorial is to show a typical ProCAST set up for Low Pressure Die Casting process, including thermal cycling. Process : Duration of the cycle : 280 s Mold opening time : 240 s Part ejection time : 250 s Start time of the die spraying : 255 s End time of the die spraying : 260 s Mold closing time : 270 s Casting temp
原创力文档

文档评论(0)