- 3
- 0
- 约12.45万字
- 约 240页
- 2019-12-27 发布于江苏
- 举报
* * Objective 27 X Forcer (LMCF04A) has 5.5 – 6 ohms across phases. Y Forcer (LMCF06A) has 4 – 4.5 ohms across phases. Check clearance with shims run in diagnostics and ISCAN Health Check. * Highlight Voltages,Related cards etc as will be asked on next slide. * * * * Fault one: Place a small piece of insulating tape over the encoder strip (ie approx 2mm) This will cause the camera to make an abrupt jump. It should also throw off the camera ref position / fiducial location etc. Use the iSCAN in power off mode to detect the break in encoder feedback. Fault two: Rotate the 3-pin power conn
您可能关注的文档
最近下载
- 给排水国标图集-04S516:混凝土排水管道基础及接口.pdf VIP
- 初中物理新沪科版八年级全册第十二章章末复习教学课件2025春.pptx VIP
- TCL 智能门锁K7X使用说明书.pdf
- 2025年卫生高级职称考试(预防疾控微生物检验技术)历年参考题库含答案.docx VIP
- 规范《FZ∕T51010-2014-纤维级聚对苯二甲酸1,3-丙二醇酯切片(P∕T∕T)》.pdf
- 第26课《创意展示我家乡》+课件+-+2025-2026学年人教版初中信息科技七年级全一册.pptx VIP
- 2026年入党积极分子培训考试卷及答案 (共六套).docx VIP
- 广东省金山中学、中山一中、佛山一中、宝安中学四校2023-2024学年高二下学期第一次联考数学试卷(含答案).docx VIP
- 2025年福建省厦门市中考数学试卷真题(含标准答案及解析).docx
- 中国临床肿瘤学会(CSCO)头颈部肿瘤诊疗指南.pptx VIP
原创力文档

文档评论(0)