mit基础工程作业.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
1.364 ADVANCED GEOTECHNICAL ENGINEERING HOMEWORK NO.1 FALL SEMESTER 2003 Due: Friday 26 September 1. BACKGROUND INFORMATION The Post Office Square project in Boston, Massachusetts involves the demolition of an existing garage (two storeys above and one storey below ground) and the construction of new building structures and a 7-level underground parking. The site is bounded by the intersections of Pearl, Congress, Milk and Franklin Streets (Figure 1). Existing buildings up to 40 stories tall are located adjacent to the site and are supported on shallow foundations (mats and footings). The site investigations for the project were carried out in two main phases. The details are contained in the Report Nos. 1 to 4. 2. AVAILABLE DATA Report No.1 presents the geotechnical information obtained from the initial investigation (BH 1 to 15). The report also includes a compilation of additional borehole data derived from other sources for the surrounding areas outside the site boundary. Report No.2 contains a summary of the supplementary laboratory tests conducted. Phase 2 of the site investigation program addresses mainly the ground water conditions surrounding the site (BH101 to 115) and field vane shear tests. The information is given in Report No.3. The final Report No.4 summarizes the data obtained from water pumping tests. Five copies of the site investigation data are available in binders.These can be signed out for limited periods of time. Please be courteous to your fellow students and return them when you are not actually using them. 3. TASKS You are required to evaluate and interpret the information contained in the site investigation reports with regards to the ground conditions encountered. The following specific tasks must be carried out and submitted:- a. Draw two geological cross-sections across the site as shown in Figure 2. The section should include the borehole information for areas surrounding the site that would have an impact on design decisions. Label

文档评论(0)

152****7770 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档