- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Supplier Process Qualification/
Site Qualification Audit Report
Date:
2012/10/24
Company:
CPUser (Tronixin)
Sites:
CPUser(Tronixin) Shenzhen factory
Facility/ Fab/Line:
Connector
This information may not be shared outside the audited suppliers company without express written permission from Lenovo.
Page PAGE 1 of NUMPAGES 4
Overall Site Rating:
Exemplary
Acceptable
X
Not Acceptable
Reason for Audit: General Connector facility/process Audit
Lenovo Attendees:
Leon Lee, Think ECAT Engineering connector, Subsystem Dev
Vence Lu , Think ECAT Engineering connector, Subsystem Dev
Supplier Attendees:
Jackson, Sales VP
Paul, Sales manager
Jim, Quality Department Supervisor
Executive Summary:
CPUser (Tronixin) is a connector and cable assembly manufacturer, who provides I/O connector Card reader in Laptop business, and also SATA connector in D/T business.
Our general impression is that, CPUser (Tronixin) has experience focus on SATA connector design and I/O production line. However, there are many disadvantages, Stamping department is almost no production due to lack of capable engineer and management, poor IPQC FAI control process, Manual assembly line should improve base on IE tools/method, Auto machine design should fine-tune in detail.
Following confirmed items that needs to be taken appropriate action and to be implemented for rated “C – critical items” immediately. Hopefully, it could help CPUser (Tronixin)’ further quality improvement and we expect CPUser (Tronixin) team to prepare “corrective actions plan” and send to Lenovo NB ECAT/connector Procurement Engineering within next 5 working days.
KEY:
E = Exemplary Practice
P = Positive Practice
R = Request for information
I = Improvement Area
M = Minor Concern to be Addressed
C = Major Concern That Must be Addressed Immediately
Major/Minor Concerns Improvement Area
Rating
What
C1
C2
C3
C4
Stamping capability is poor: Most of stamping machine not run