- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Batching plant operating procedures
General rules
The operators must be trained and qualified; they are required to be skilled in the operating procedures and basic requirements of equipment maintenance.
Before operators leave their shift, besides the daily maintenance work, they must make detailed records (running condition of each main equipment; problem found during running; repair and maintenance; items that need the next shift operators pay attention to.) on the running logs, and inform running condition to the next shift operators positively.
Operators on duty are required to finish equipment maintenance work besides the production mission, follow the equipment maintenance rules.
Lubricating oil, hydraulic oil and cooling oil that equipment use should not be doped, mixed or replaced. Operators should ensure the filling oil is clean, filter oil if necessary. Operators must carry out the lubrication process regularly, qualitatively, quantitatively.
Maintenance man on duty should keep the equipment and surroundings clean and in order.
Shift manager should keep each control system, operating system, mechanical part complete and functional, solve the problem immediately. If it influences the production, must report to the office.
Repair man should observe their duty area regularly, if they find some problem about maintenance, inform the maintenance man, and solve in time.
Running procedures
Operators must check all mechanical part, control lines fully, confirm they are in good condition, and then start the operation.
After finish every mission, should fill suit quantity of size #3 aggregates and water in the mixer, start the mixer for about 5 minutes to clean it.
Maintenance man should clean aggregates distribution devices each every week, if the pre-cooling concrete production is carried out, such maintenance need to do every shift.
When the air pressure is lower than 0.5MPA, production is forbidden.
Concrete mix proportion parameters must be inputted into comp
您可能关注的文档
最近下载
- 2022年海南省自贸港政策知识竞赛考试题库集(含答案).pdf VIP
- 乙醚安全技术说明书(MSDS).pdf VIP
- 2025年医学课件-流式细胞术原理及在中医药研究中应用简介.pptx VIP
- 天梭TTOUCH触屏表使用说明书_中文.pdf VIP
- 电工基础(第2版)课件:电路基本元件及其伏安特性.pptx VIP
- 传感器原理及应用技术(第2版)全套PPT课件.pptx
- 日常生活能力量表(ADL)量表.docx VIP
- GB14881-2025食品安全国家标准培训大纲.pptx VIP
- 消防继续教育题目和答案(完整版).docx VIP
- 附件大连民族大学校院两级财务管理办法-大连民族大学教务处.doc VIP
文档评论(0)