文化艺术中心建设项目可行性研究报告.pdfVIP

文化艺术中心建设项目可行性研究报告.pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
First compliance review of the a pplication of the appraisal Committee, only through t he complia nce review of the a pplication to take part i n a detailed review. 8.1 applicati on complia nce review: does not meet one of the following conditi ons, procuratori al Agency to submit a pplication through complia nce reviews, be i nvalidate d: (1) application of t he formats, conte nts, m eet the requirements of sele cted file s, powers of Attorney, de clarations by t he legal re prese ntative and the te nder agent a pplication to meet t he requirements; (2) lice nce and a bi ddi ng agent qualifi cations meet the requireme nts; (3) the similar pr oject te ndering age ncy age nt number a nd provide pr oof of material complia nce; (4) the tenderi ng Agency inte nds to put int o this project the number of professi onals to meet t he requirement s; (5) are inte nded to the agent of the pr oje ct as a project manager has milar proje cts the number of and refere nces to meet the requirements; (6) no fraud ca se. 8.2 applicati on revi ew in detail t he Evaluation Committee through compliance reviews will be sele cted for detaile d review of the applicati on. 8.2.1 te nder agent i nstitutions similar pr oject te nder performance re quireme nts (16 points) tender age nt instituti ons similar project tender performa nce 16 points, by two part composition (1) agent similar pr oject of cum ulative bi d amount scored cal culati on rules for: Age nt water project bid am ount (on January 1, 2007 ha s ha s bi d notice for associate) cum ulative each reache d 100 milli on Yuan have 2 points, water pr oject cum ulative bi d amount scored up not over 6 points. In a dditi on, complete s a bi d wort h more than 500 million yua n in t otal 1 minute, but other item s score accum ulated wi nning amount up to a maximum of 6 points. (2) cal culati on rule for the number of agents similar pr ojects: pr oxy bid am ount (since January 1, 2007 winning notice shall prevail) b

文档评论(0)

guocuilv2018 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档