老矿区边坡治理(英文).pptVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
The Monongahela South No. 1 Dangerous Highwall Reclamation Project, City of Monongahela, Pennsylvania Typical Pennsylvania Dangerous Highwall Reclamation Project The Monongahela South No. 1 Dangerous Highwall Reclamation Project was very unique project and everything but a Typical Reclamation Project Site of the Whiskey Rebellion Project Location Background The site is located ~15 miles south of Pittsburgh The site was surface mined from 1945 to 1947 A 1,000 ft. long highwall (averaging 40 ft. high ) and bench were left The Diocese of Pittsburgh acquired the property in 1950 Construction of St. Anthony’s Church was completed on the bench at the site in 1952 The parochial school adjacent to the church was completed in 1954 Site Conditions St. Anthony’s Church St. Anthony’s Parochial School St. Anthony’s Parish House The Problem Sign at End of Church Street above Highwall Highwall – West End of Site Highwall – Middle of Site High Potential for Continued Rock Falls – School Closed Design Summary Design completed by GAI Consultants, Inc. of Pittsburgh, PA Awarded a two-phase design contract in June 2002 Phase 1 – Alternatives analysis Completed in October 2002 Cost: $24,860 Phase 2 – Final design of preferred alternative Completed in March 2003 Cost: $68,423 Selected Alternative Excavation of the unstable highwall to reduce the slope of the eastern end of site Construction of a soldier pile and lagging retaining wall to stabilize the western end of the highwall Due to the proximity of homes and Church Street above the highwall and the school and Parish house below, cutting the highwall back in this area was not feasible Design Challenges Safety (for both the contractor’s employees and the general public) Long-term stability of the reclaimed site Construction and maintenance costs Accommodating the long-range plans of the Parish Maintaining normal operation of the church during construction Design Challenges Disposal of excess fill material Incidental coal extraction S

文档评论(0)

139****6621 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档