Introduction of High-speed rail(高速铁路概论) Unit 1 Stations, lines and turnouts 1-2.pptVIP

  • 8
  • 0
  • 约1.72千字
  • 约 8页
  • 2020-09-16 发布于北京
  • 举报

Introduction of High-speed rail(高速铁路概论) Unit 1 Stations, lines and turnouts 1-2.ppt

1. RAILWAY STATIONS, LINES NIRT Ⅱ Railway track 1.Track classification(station) ⑴main track Rome number (Ⅰ Ⅱ…) ⑵station track Arabia number (1,2,3 ……) ⑶depot track ⑷branch track ⑸special purpose track ⑵ Station track Arrival and departure track:The track is used for receiving and departing passenger train and freight train. Shunting track :The track is used for shunting operation. Vehicles and locomotives run from one track to another for specified purpose. main track Ⅱ Arrival and departure track 1,3,4,6,7 Shunting track 8,9,10,11,12 freight track Lead track 13,14 locomotive running track 5 inspection and maintenance track Car depot Freight handling yard Locomtotive yard Simple hump 2. Track number Station tracks should have uniform number. The main tracks are specified by Rome number (Ⅰ,Ⅱ……) The station tracks are specified by Arabia number (1,2,3 ……) 2. Track number 2.1 On a single-track railway, the number sequence shall be started from the side of the station building to further direction After the tracks in front of the station building have been numbered, we continue to number the other tracks according to the distance between the track and the station. The track of the shortest distance will be numbered first. 2. Track number 2.2 On the double-track railway ⑴ clarify the up and down direction main tracks,and number them with Rome number (Ⅰ Ⅱ…) down direction track——Ⅰ up direction track——Ⅱ ⑵ number the tracks on the side of the down direction with Arabian odd number (3,5,7,9 …) ⑶ number the tracks on the side of the up direction with Arabian even number (4,6,8,10 …) * 100 0 50 75 25 100 0 50 75 25 *

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档