- 1、本文档共19页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Revision Note
SL NO
REVIEW NO
DATE OF REVIEW
REVIEWED SECTION/PAGE NO
1
1
13.12.2019
2
2
28.12.2019
As per below table
S.No.
DMRC’s Comments Description in brief on revision R-2 (Safety Comments)
Comments incorporated in Section Number
1
Organization chart with names of responsible key safety person to be submitted
Incorporated in Section 5.1
2
Clause 6.5 : Excavation below ground level: Procedure and precaution required to avoid soil collapse in case excavation need to be carried out below 2 meter need to be submitted
Incorporated in Section 6.8
3
Work permit system to dig-where underground services may be located as mentioned under clause 39.2 iv Condition of contract on safety Health and Environment, May 2019 needs to be incorporated in Method Statement
Incorporated in Section 6.3 and format enclosed as Annexure-A
4
As mentioned under clause 38.1 (viii), Condition of contract on safety Health and Environment, May 2019, for safety of utility as well as personnel, a trial trench shall be excavated manually only after clearance from competent Electrical personnel in respect of Electrical cables subsequent to testing by a cable detector. Same need to be incorporated in Method Statement.
Incorporated in Section 6.3 and 6.5
5
Emergency procedure for accidental damage to Gas pipeline, Petroleum pipeline or any other critical utility need to be mentioned.
Incorporated in Section 6.9
6
Responsibility and person accountable for implementation of all safe work procedures at site need to be detailed
Incorporated in Section 5
Project Title: DMRC CONTRACT: DC-01-Part Design and Construction of elevated Viaduct, Elevated Ramp, siding line and Ten Elevated stations viz. Keshopur, Pashchim Vihar, Peeragarhi, Mangol Puri, West enclave, Pushpanjali, Deepali Chowk, Madhuban Chowk, Prashant
您可能关注的文档
最近下载
- 汉字起源及发展PPT模板.pptx
- “燕园元培杯”2023-2024学年全国中学生地球科学奥林匹克竞赛决赛试题详解.docx VIP
- 施工安全施工措施.docx VIP
- 贵州大学2021-2022学年第1学期《西方经济学》期末考试试卷(A卷)含参考答案.docx
- (完整版)文创产品设计专题课件.ppt VIP
- 重庆电大土木工程毕业设计论文.doc VIP
- 2022年莱芜市(中小学、幼儿园)教师招聘考试题库及答案解析.docx
- 医疗器械法规试卷-医疗器械从业人员岗前培训文件.pdf
- 小学生节约用水《节约用水从我做起》主题班会PPT课件.pptx
- 年产30万吨氨碱法制纯碱碳化工段的工艺设计.doc
文档评论(0)