- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Design Progress Schedule of Smart Hotel Weak Current System
The total number is 60 calendar days, and the specific arrangement is as follows:
Serial number
Design stage
Content of design work
Design results
Depth of design results
Submission progress of design results
Remarks
1
Cooperation from owner is required before design
Owners provide the following information:
Construction layout drawing
Decorate figure (including kitchen drawing)
Heating and ventilation drawing
Plumbing drawing
Electromechanical drawing
Customer house type images
Guest room electrical diagram and control logic table
Lighting Loop table and drawing provided by lighting consultant
2
Project design
1.1 System overall function
1.2 Clear subsystem to design
1.3 Overall system block diagram
1.4 System design standards
1.5 Main equipment technical indicators
1.6 Divide work interface
1.7 Investment density report
Program text
System diagram and investment density
8 days
3
Audit, follow up and modification of owners and hotel management companies
2 days
4
Preliminary design
2.1 System chart
At least include the following content:
2.1.1 Describe every part of system operation
2.1.2 Describe the control, transfer and feedback and other kinds of relationships between various components of system operation
2.1.3 Other necessary description
2.2 Equipment material selection
2.2.1 Equipment material brand, producing area, type specification and quantity
2.2.2 Main parameter index of equipment materials
2.3 System estimates
2.3.1 System device and accessory estimates
2.3.2 Installation, service and training budget.
Preliminary design drawings
System diagram, point position table and equipment material selection, and book of estimates
16 days
5
Audit, follow up and modification of owners and hotel management companies
2 days
6
Construction drawing design
3.1 System chart
At least include the following content:
3.1.1 Describe every part of system operation
3.1.2 Describe the control, transfer and feedback
您可能关注的文档
- 译文-工程竣工验收报告.doc
- 译文-工程质量指标考核表.doc
- 译文-客户满意度评价表.doc
- 译文-客户满意度调查表.doc
- 译文-设备维护保养表.doc
- 译文-隐蔽工程实施与验收规范.doc
- 硬件实验课程设计-雍宁.doc
- 职业院校大数据技术与应用专业建设与人才研修班邮件.doc
- 职业院校中层干部教育领导力与执行力高级研修班(邮件).doc
- 中职班主任基本功大赛解析暨班级管理能力提升高级研修班邮件.doc
- 2025-2026学年初中英语新世纪版七年级第一学期-新世纪版试用本教学设计合集.docx
- 2025年新能源行业数字化转型企业可持续发展战略报告.docx
- 期货行业风险控制实务分析报告:2025视角下的未来五年趋势.docx
- 年产5万吨二甲基亚砜项目可行性研究报告.docx
- 深入解读:2025年侵入式脑机接口电极材料创新驱动行业变革趋势及市场动态.docx
- 年产5万吨防火阻燃材料项目可行性研究报告(模板).docx
- 2025-2026学年初中语文八年级上册(2024)统编版(部编版)(2024)教学设计合集.docx
- 内科护理PPT课件 肺炎病人的护理.pptx
- 复合材料在汽车轻量化应用前景分析报告:2025年展望与未来十年趋势.docx
- 2025年新能源汽车智能网联车辆安全认证标准与产业发展.docx
文档评论(0)