ICP -- Planned Start Time Assign PST for each task Definition: Planned Start Time (PST) is the expected start date that a task will begin taking material availability into consideration Calculation: PST= max (EPST, LPST) Each manufacturing task will have a PST PST values may be overriden through the user interface ICP -- Capacity Utilization Determine bucket (operation time interval) configuration -- from variable capacity bucket size data Calculate capacity for each bucket -- from resource calendar data Calculate work load in each bucket based on PST and run time of each task FP Finite Cap