- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
翻译
英文原文
Gas drainage drilling rig
British Coal Office owned coal mine in the early 1950s to the mining area of a nearby gas drilling drainage, and now are very small compared to the scale. Flow into the roadway in the gas pressure was general-in ventilation system ruled out. This article will introduce some modern mining technology with the development of the rig.
When the increase in coal production, coal face promote optimum fast, high concentration of gas to be ruled out, this will lead to modern gas drainage system development, that a regional gas drilling, drilling connect to the pipeline system, Reply to the surface of gas will be excluded. About 40 to 50 years ago, the British-made drilling rig not a satisfactory. British drilling rig equipment companys decision to meet this requirement.
In recent years the design and development work in the United States Department of State Coal help a large number of staff, consultation and cooperation. The successful development of the EDECO Hydrack series Ⅰ rig, the rig used for five years until 1963 the introduction of the new design series Ⅰ Hydrack EDECO micro-drilling rig. This is now the use of the rig, designed after the reform of the review.
Drill Design
Hydrack gas drilling rig is the first for the electro-hydraulic drilling rig, the rig before most of the air-powered. Drill pipe and bit by a hydraulic motor through the rotating six-speed gear box; to be thrust into power and the trip from 815 mm to achieve the hydraulic cylinders, with rack and pinion system to process will be carried out twice. About the most torque 949 Nm, a way to about 1702 mm bit on the effective thrust of about 2,794 kg. Diameter drill pipe design for the 60.3 mm, for the 1524 mm long with a cone-shaped male connector, commonly known as EF / N-type drill pipe.
1963, the design of the micro-Hydrack rig. This is a very short period of Qinger drilling rig, his trip to 851 mm. A three-speed gear box, the largest of its torque to 691 Nm, e
文档评论(0)