斯伦贝谢Next培训定向井PPT 05-05 Multilateral Drilling Procedure.ppt

Run in with the Drop-off Liner Run the drop-off liner on drill pipe, deflecting via RDT into the lateral. The drill pipe holds it in place as the cementing (Optional) process begins * Cement the Drop-off Liner The cement is then pumped through the liner to a point short of the PBR. As the cement starts to hydrate the running tool is released from the liner and POOH. * Final Well Configuration POOH with Deflector and SLT Level 2 Multilateral is now complete with a drop-off liner either cemented or non-cemented * Multilateral Drilling Procedure Now, YOU should be able to: Describe the procedu