Run in with the Drop-off Liner Run the drop-off liner on drill pipe, deflecting via RDT into the lateral. The drill pipe holds it in place as the cementing (Optional) process begins * Cement the Drop-off Liner The cement is then pumped through the liner to a point short of the PBR. As the cement starts to hydrate the running tool is released from the liner and POOH. * Final Well Configuration POOH with Deflector and SLT Level 2 Multilateral is now complete with a drop-off liner either cemented or non-cemented * Multilateral Drilling Procedure Now, YOU should be able to: Describe the procedu
您可能关注的文档
- 斯伦贝谢Next培训定向井PPT 03-05 PDM Bottom Hole Assemblies.ppt
- 斯伦贝谢Next培训定向井PPT 03-06-7 IntroductionToRotarySteerableSystems.ppt
- 斯伦贝谢Next培训定向井PPT 03-07 (Optional) Axial Force in Submerged Tubulars.ppt
- 斯伦贝谢Next培训定向井PPT 04-01 Directional Well Path Design NEW.ppt
- 斯伦贝谢Next培训定向井PPT 04-02 Horizontal Well Planning.ppt
- 斯伦贝谢Next培训定向井PPT 04-03 Horizontal Drilling Calculations.ppt
- 斯伦贝谢Next培训定向井PPT 04-04-5 Drillstring Design.ppt
- 斯伦贝谢Next培训定向井PPT 05-01 Hole Cleaning.ppt
- 斯伦贝谢Next培训定向井PPT 05-02.Introduction to Multilateral wells.ppt
- 斯伦贝谢Next培训定向井PPT 05-03 Types of Multilateral wells.ppt
原创力文档

文档评论(0)