Run in with the Drop-off Liner Run the drop-off liner on drill pipe, deflecting via RDT into the lateral. The drill pipe holds it in place as the cementing (Optional) process begins * Cement the Drop-off Liner The cement is then pumped through the liner to a point short of the PBR. As the cement starts to hydrate the running tool is released from the liner and POOH. * Final Well Configuration POOH with Deflector and SLT Level 2 Multilateral is now complete with a drop-off liner either cemented or non-cemented * Multilateral Drilling Procedure Now, YOU should be able to: Describe the procedu
您可能关注的文档
- 斯伦贝谢Next培训定向井PPT 03-05 PDM Bottom Hole Assemblies.ppt
- 斯伦贝谢Next培训定向井PPT 03-06-7 IntroductionToRotarySteerableSystems.ppt
- 斯伦贝谢Next培训定向井PPT 03-07 (Optional) Axial Force in Submerged Tubulars.ppt
- 斯伦贝谢Next培训定向井PPT 04-01 Directional Well Path Design NEW.ppt
- 斯伦贝谢Next培训定向井PPT 04-02 Horizontal Well Planning.ppt
- 斯伦贝谢Next培训定向井PPT 04-03 Horizontal Drilling Calculations.ppt
- 斯伦贝谢Next培训定向井PPT 04-04-5 Drillstring Design.ppt
- 斯伦贝谢Next培训定向井PPT 05-01 Hole Cleaning.ppt
- 斯伦贝谢Next培训定向井PPT 05-02.Introduction to Multilateral wells.ppt
- 斯伦贝谢Next培训定向井PPT 05-03 Types of Multilateral wells.ppt
最近下载
- 2026全球独居石矿市场竞争与中国进口替代方案报告.docx
- 人教精通版(新教材)小学六年级英语上册Unit 2 My feelings每课时教学设计汇编(含四个教学设计).docx VIP
- 2026年医院感染的诊断及上报流程PPT课件.pptx VIP
- 定额〔2022〕1号-2018年版电力建设工程概预算定额价格.docx VIP
- 玩具外型设计与制作 通模型树脂玩具外型设计与制作.pdf VIP
- NBT 10216-2019 风电机组钢塔筒设计制造安装规范.pdf VIP
- 2021年广西柳州市中考地理试题真题(word版,含答案+解析).docx VIP
- 新版2026秋新教材人教版四年级上册数学全册教案(教学设计)合集50.pdf
- 小儿髓母细胞瘤护理查房.pptx VIP
- NBT 31087-2016 风电场项目环境影响评价技术规范.pdf VIP
原创力文档

文档评论(0)