- 7
- 0
- 约1万字
- 约 21页
- 2021-03-10 发布于境外
- 举报
Horizontal Well Planning Now, YOU should be able to: Explain factors to be considered in the design and planning directional and horizontal wells * * * * * Determining the Kick-off Point. The Kick-off point is defined as a point in the wellbore at a given vertical depth below the surface location where the well is to be deviated away from vertical in a desired direction up to a desired inclination at a desired build rate. The selection of the Kick-off point is made by considering the geometrical well path and the geological characteristics. The optimum inclination of the well is a function of
您可能关注的文档
- 斯伦贝谢Next培训定向井PPT 01-03 Well Objectives and Target Issues.ppt
- 斯伦贝谢Next培训定向井PPT 01-04 Coordinate Systems and Magnetic declination 2014.pptx
- 斯伦贝谢Next培训定向井PPT 02-01 Deflection methods.ppt
- 斯伦贝谢Next培训定向井PPT 02-02 Anti colllision and advanced well planning.ppt
- 斯伦贝谢Next培训定向井PPT 02-03 Survey tools and Non-Magnetic Tool Lengths.ppt
- 斯伦贝谢Next培训定向井PPT 02-04 Survey Interpretation and basic calculations.ppt
- 斯伦贝谢Next培训定向井PPT 02-05 MWD and LWD.ppt
- 斯伦贝谢Next培训定向井PPT 03-01-2 General Equipment Overview.ppt
- 斯伦贝谢Next培训定向井PPT 03-03-4 Rotary BHA.ppt
- 斯伦贝谢Next培训定向井PPT 03-05 PDM Bottom Hole Assemblies.ppt
- 斯伦贝谢Next培训定向井PPT 04-03 Horizontal Drilling Calculations.ppt
- 斯伦贝谢Next培训定向井PPT 04-04-5 Drillstring Design.ppt
- 斯伦贝谢Next培训定向井PPT 05-01 Hole Cleaning.ppt
- 斯伦贝谢Next培训定向井PPT 05-02.Introduction to Multilateral wells.ppt
- 斯伦贝谢Next培训定向井PPT 05-03 Types of Multilateral wells.ppt
- 斯伦贝谢Next培训定向井PPT 05-04 Multilateral Well Planning.ppt
- 斯伦贝谢Next培训定向井PPT 05-05 Multilateral Drilling Procedure.ppt
- 斯伦贝谢Next培训定向井PPT 05-06 Directional Drilling Problems and Solutions.ppt
原创力文档

文档评论(0)