斯伦贝谢Next培训定向井PPT 04-02 Horizontal Well Planning.ppt

Horizontal Well Planning Now, YOU should be able to: Explain factors to be considered in the design and planning directional and horizontal wells * * * * * Determining the Kick-off Point. The Kick-off point is defined as a point in the wellbore at a given vertical depth below the surface location where the well is to be deviated away from vertical in a desired direction up to a desired inclination at a desired build rate. The selection of the Kick-off point is made by considering the geometrical well path and the geological characteristics. The optimum inclination of the well is a function of