* * Note for reference a SPE paper published 2003 by S.D. Joshi – SPE 83621 discusses McKenzie Co. N. Dakota ~ 8000 ft TVD well costs as $650,000 drilled and completed vs $1,200,000 horizontal [2500 – 3000 ft horizontal] (reentries cost $675,000). These costs are probably from 2002 He also says that in the U.S horizontal well costs are about 1.5 – 2.5 times a vertical well with reentries about 0.4 – 1.3 times vertical well costs * Copyright ? 2001 – 2014, Schlumberger. All rights reserved Copyright ? 2001 – 2014, Schlumberger. All rights reserved Copyright ? 2001 – 2014, Schlumberger. All rig