GOVERNMENT OF THE PEOPLES REP UBLIC OF BANGLADESHOFFICE OF THE P ROJECT DIRECTOR
P AIRA BRIDGE (LEBUKHALI BRIDGE) CONSTRUCTION P ROJECTROADS AND HIGHWA YS DEP ARTMENT
ROAD TRANS PORT AND HIGHWAY DIVISIONMINISTR Y OF ROAD TRANS PORT AND BRIDGES
CONSTRUCTION OF 1470 METER LONG P AIRA BRIDGE (LEBUKHALI BRIDGE)OVER THE RIVER P AIRA INCLUDING APP ROACH ROAD, BANK P ROTECTIVEAND RELATED WORK ATTH KM BARISAL -P ATUAKHLI ROAD(N-8)PAIRA BRIDGE (LEBUKHALI BRIDGE)
Loading Test P roject of the P iles试桩静载试验实施方案
中国北京建筑大学
北京市城市交通基础设施建设工程技术研究中心中国黑龙江路桥一公司
Beijing Urban Trans po rtation InfrastructureEngineering Technology Research CenterBUCEA, BEIJING CHINA
No. 1st Branch of Heilongjiang Road and Bridge Co., Ltd., Haerbin CHINA2016-02-21
PAIRA BRIDGE (LEBUKHALI BRIDGE)
CONSTRUCTION PROJECT
Loading Test Project of the Piles试桩静载试验实施方案目录
1 工程概况 /Engineering background1.1
1 工程概况 /Engineering background
1.1 桥梁概况
1.2 试桩概况
2 试验依据及要求
2.1 试验依据
2.2 试验要求
/Bridge configuration
/ Outlines of the testing piles . /Test basis and requirements. /Test basis
/Test requirements
3 试验原理 / Test principles
4 实施方案 /Test project
4.1 试桩位置 / The location of testing piles
4.2 荷载箱的选择 / The choice of loading cells
4.3 测试仪器安装 / Installation of test instruments
4.3.1 荷载箱和连接的压力管线 /Load box and its connected pressure pipeline
4.3.2 振弦式位移传感器 /Vibrating displacement sensor
4.3.3 应变杆 /Strain bars
4.4.4 振弦式应变计 / Vibrating strain extensometer
4.3.5 塑料管 /Plastic pipe
4.3.6 动力组件 /Power components
4.3.7 安装基准梁及数据采集系统
4.4 试桩进度安排 / Testing Schedulre
4.5 现场测试 /Field Test
12 14 .. 14 . 15
15 . 15
15 15 /The installation of reference beam data collectionsystem16
TOC \o 1-5 \h \z 17 17
端部承载力试验(3.5m 试桩)/Bearing capacity test of pile end (for ① 3.5m test pSei7
总承载力和分层侧壁摩擦力试验( 3.5m 试桩 ) /Total bearing capacity test layered
sidewall friction for ① 3i.l5ems.t.e..s..t..p 19
总承载力和分层侧壁摩擦力试验(其它试桩 )/Test of total bearing capacity and layered
sidewall friction test (for Other test piles) 20
结
原创力文档