技术人员英文自我评价.docxVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
技术人员英文自我评价 After xx-xx years of work and study, I also found myself away from a professional talent there is a gap, mainly in the work skills, work habits and work of thinking immature, and I will continue to work in the hone andImprove your own place. Carefully summarize yourself in the xx-xx years of work mainly in the following areas are not good enough: 1. The work of the rationality is not clear enough to distinguish between priorities and priorities; Project technicians work is a more complicated work, and engineering, marketing, cost, pre-procurement departments to provide technical support and docking, but also and design institutes, government departments to communicate the game, and more things, you need to have detailed The primary and secondary clear plan, which needs to be completed immediately, which can slowly overtime to complete this year on their own great progress in the plan, but in this area there is still much room for optimization. 2. The control of the Institute of Design is not enough; Control of the design institute is not enough focus on some of the programs, construction plans to promote the smooth. Some things clearly agreed that the design institute is very simple or very sincere commitment to the time or finish. In the progress of control, the future time to complete the planned node in advance for some time to deal with temporary things. In addition, the future contact with the Design Institute, in addition to contact the project leader and the hands of people who work, to contact the leadership of Design Institute, so that they participate. 3. not enough familiar with the drawings, drawing less time; In the first half of the work, found that the problem is very many drawings, including errors and shortcomings are not considered in place at the time of design considerations, the control of this piece is clearly not enough. Usually always work, but in the final analys

文档评论(0)

软件开发 + 关注
官方认证
服务提供商

十余年的软件行业耕耘,可承接各类需求

认证主体深圳鼎云文化有限公司
IP属地陕西
统一社会信用代码/组织机构代码
91440300MA5G24KH9F

1亿VIP精品文档

相关文档