- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
OEE: Overall Equipment Efficiency
Introduction
OEE Definition
OEE measurement
OEE case study
OEE analysis and improvement
New investment requests
Contents
OEE measurement and improvement must be implemented:
For heavy and expensive means that are a bottleneck comparing to the customer demand in order to deliver,
then, in order to provide data’s to request a new investment
Introduction
OEE Definition
OEE measurement
OEE case study
OEE analysis and improvement
New investment requests
Contents
OEE rate Calculation (%)
Added value Operating time =
Nb of good parts produced x Standard Cycle Time
Nominal opening time =
Days of the week when the factory is open on a regular basis (ie including management, support functions,..)
OEE =
Added value Operating time
Nominal opening time
Standard Cycle Time =
The best ever observed
respecting quality criteria
Introduction
OEE Definition
OEE Measurement
OEE case study
OEE analysis and improvement
New investment requests
Contents
OEE : Category of losses
1 Planned stops
(meals, breaks, training, meeting, planned maintenance, tests)
2 Machine breakdowns and no planned
maintenance
6 Micro-stoppage and Slow down
(what is left over after deducting the 6 other causes of losses)
5 No Quality
(Parts manufactured but not good and rework)
No
OEE
losses
4 Organizational stops
(Lack of tool, material, worker, punctual lack of load)
3 Change over time
Total Available Time
365 days x 24 hours
Value added operating time *
Factory not opened on a regular basis
OEE (%)
100 (%)
Nominal opening time
7 Equipment not open but factory open
* Nb of good parts produced x Standard cycle time)
What are Cycle time and Change over time?
PRODUCT A
1st
PRODUCT
B
Quality
not yet OK
PRODUCT
B
Quality OK
Cycle Time (CT) =
Time spent between I load part « A » until I load next part « A »
CT
CT
Change Over time (C/O) = time between last good part “A” and first good part “B”
C/O time
Unloading
Loading
PRODUCT A
Transformation
CT
Unloading
Loadin
您可能关注的文档
最近下载
- 半导体物理学(第8版)刘恩科课后习题答案解析.pdf
- 《汽车理论》清华大学余志生版.pdf VIP
- 华为 GPON OLT 组播业务配置.pdf VIP
- 文华财经期货软件指标公式源码九转系列指标.doc VIP
- ISO37001-2016反贿赂管理体系手册与全套程序文件汇编.docx
- 信捷x-sight视觉系统使用手册v2.1a.pdf
- 二+宁夏闽宁镇:昔日干沙滩,今日金沙滩(教学设计)-【中职专用】高二语文上(高教版2023职业模块).docx
- GB50303-2015建筑电气工程施工质量验收规范.docx VIP
- 婴幼儿的科学喂养课件.pptx VIP
- 造林工程--施工工期与保证措施-工程进度计划及保证措施.doc VIP
文档评论(0)