- 6
- 0
- 约2.18千字
- 约 39页
- 2021-10-22 发布于浙江
- 举报
Unit 5
What were you doing when the rainstorm came?;Heart of the Ocean
海洋(hǎiyáng)之心 ;The police caught two suspects.;Who is the real thief ?;What were you doing at 9 :00 last night?;What were you doing at 9 :00 last night?;第七页,共39页。;Lets watch a video first.;I was using the computer at home at 9:00 last night.;--Who told lies, or ?;A person cannot be judged by his appearance.;在.....(过去(guòqù)的某一时刻)正在做......;We use the past progressive tense to say that sb was in the middle of doing sth at a certain time (in the past).;The present progressive tense 现在(xiànzài)进行时 ;The past pro
您可能关注的文档
- ug产品设计特征操作.pptx
- ug--运动仿真教程.ppt
- ug自动编程教程.ppt
- uml-ocl对象约束语言.pptx
- ug基本命令详细教程.ppt
- unit-1-check-中职英语拓展模块.ppt
- un-comtrade数据库使用指南.ppt
- unit-2-外研社英语基础模块-第二册中职教育.ppt
- unit-12life-is-full-of-the-unexpected第一课时课件.ppt
- unit-4-feelings-完整课件-外研版join-in-三年级下册第四单元课件.pptx
- 4、回填施工记录表.XLS
- 2、原材料、构配件进场使用检查记录表.xls
- 1、CK0+600~ CK0+700 水泥混凝土面层.XLS
- 1、CK0+000~CK0+200 AC-20C下面层(下洒透层油).XLS
- 1、工程材料进场使用清单.xls
- 2、4%水泥稳定石屑下基层(CK0+200~CK0+400)200米为一检验批(报验表).XLS
- 1、4%水泥稳定石屑下基层(CK0+000~CK0+200)200米为一检验批(报验表).XLS
- 5、CK0+800~ CK0+860左侧路缘石_重命名_2017-1-17-11-35-12.XLS
- 2、CK0+700~ CK0+860 水泥混凝土面层.XLS
- 022、CK0+200~CK0+400 AC-13C上面层(下洒粘层油).XLS
最近下载
- (正式版)D-L∕T 544-2012 电力通信运行管理规程.docx VIP
- 2026年第四季度党课讲稿(含PPT提纲).docx VIP
- 2024年河北省中考数学真题(原卷).pdf VIP
- 2026年70周岁以上老人补换领驾照,三力测试题及答案.docx VIP
- 中文版Cinema4D三维建模与视觉设计案例教程教学教案.docx VIP
- 通信运维管理总体规范 (1).docx VIP
- 2025年河北省对口升学计算机专业试题详解.doc VIP
- 通信基站运维管理规范.docx VIP
- 《中文版Cinema 4D基础与应用案例教程[R25]》教案 项目十 综合案例.docx VIP
- 三力测试题,70周岁以上老人换领驾照适用.pdf VIP
原创力文档

文档评论(0)