技术开发委托合同(中英文对照) (2500字).docxVIP

  • 9
  • 0
  • 约1.34万字
  • 约 16页
  • 2021-10-24 发布于河北
  • 举报

技术开发委托合同(中英文对照) (2500字).docx

技术开发委托合同(中英文对照) (2500字) technology development contract 技术开发〔托付〕合同 contract no.: p-1309-33 date:2013-11-08 entrusting party (party a): 托付方〔甲方〕: address: 地址: tel: fax: entrusted party (party b): 受托方〔乙方〕: address: 地址: tel: fax: party a entrust party b to research and develop technique proposal of smart t/r verification system. party b will develop key circuits verification for the solution and will be in charge of general thought plan.the following articles are reached and abided by the both parties. 甲方托付乙方设计智能收发验证系统技术方案,乙方将设计开发方案的验证电路及负责整体思路的建立,为此订立以下协议,并由双方共同遵守。 article 1 definitions 第一条定义 智能收发验证系统技术方案〔以下简称“方案〞〕,是指设计满足附件要求的总体技术方案,所需要的解决方案。该解决方案包括全部设计方案资料及关键电路验证技术资料。 1.2technical documentations shall mean all the necessary documents to design the solution and all the verification documents that party b will use in designing the solution. 技术资料,指研发解决方案所必需的资料,包含乙方在设计方案的过程中,所用法的全部有关验证技术资料。 1.3 “rd〞 shall mean research and development. “rd〞,是指讨论和开发。 1.4〞t/r〞shall mean transmit and receive. “t/r〞,是指放射和接收。 1.5〞soc〞shall mean system on chip. “soc〞,是指系统级芯片。 1.6〞asic〞shall mean application specific integrated circuit.〞asic〞,专用集成电路。 article 2 contents scopes of contract 其次条合同内容和范围 2.1 the requirements of the contract solution合同技术方案要求 2.1.1 technical content技术内容: (1)design technical proposal; 设计技术方案; (2)key circuits verification; 验证关键电路; (3)detailed technical requirements see technique attachment. 具体技术要求见技术协议附件。 2.1.2 technical method and strategy技术方法和路途: (1)should adopt soc and asic technology; 采纳soc和asic技术; (2) should adopt the smart t/r system to verify the key circuits. 采纳智能收发组件系统对关键电路进展试验验证。 2.2 the obligations of both parties 双方义务 乙方应在本合同生效后2个月内向甲方提交讨论开发方案。 (1)phase one第一阶段: 启动阶段:晶圆厂的选定、设计文件的获得、工艺文件的分析、计算机系统的建立、eda 软件的租用及购置、验证电路与整体方案设计思路的初步沟通; 3)test phase: primary test and consecutive test. 测试阶段:初测及连续测试。 (2)phase two: alter the solution according to the first phase results, and start second run. 其次阶段:依据第一阶段测试结果对方案进展修改,同时协作总体设计进展修改。 2.2.3with the both parties’ confirmatio

文档评论(0)

1亿VIP精品文档

相关文档