- 3
- 0
- 约3.63万字
- 约 28页
- 2022-03-29 发布于四川
- 举报
* I’ll introduce the identified bottlenecks by taking the example of production in an oil refinery. Please have a look at this figure. This figure is an overview of information flows and production systems in a refinery. Monthly production schedule is transferred from a head office to the refinery. The monthly schedule is split up into weekly or daily schedule at the production management section. The detailed schedule is instructed to each production section (e.g. No.1 production - CDU section, No.2 production - Reformer section, Offsite section, etc.). Each production section operates the pl
您可能关注的文档
最近下载
- 2026民生银行成都分行客户经理岗社会招聘笔试参考试题及答案解析.docx VIP
- 儿童变应性鼻炎中西医结合诊疗指南.pptx VIP
- 施 工 扰 民 告 示.doc VIP
- 全国统一建筑安装工程工期定额(2000).pdf VIP
- DZ_T 0091-1994 地质矿产勘察测量规范.pdf VIP
- 中国眼科围术期管理专家共识(2026).docx
- TD∕T 1069-2022 国土空间生态保护修复工程验收规范.pdf
- 马工程《世界经济概论》(第二版)第一章 思考题参考答案.pdf VIP
- 马工程《世界经济概论》(第二版)第二章 思考题参考答案.pdf VIP
- 北京市中国人民大学附属中学2025-2026学年高三上学期开学考试 物理试题(含答案).docx VIP
原创力文档

文档评论(0)