- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Attachment 1: Example of a gap assessment (non-exhaustive) 附件1:差距评估实例(非详尽无遗)
Key Areas
Key Elements
Detailed CCS Elements
Annex 1 rev12 draft reference
Identified potential gaps (or documentation improvement need)
versus Annex 1 draft expectations
Key supporting Site Strategies, Rationales, Risk assessments
Include Reference, title and if possible hyperlink to the
Key Site Procedures
Include Reference, title and hyperlink to the document
Facilities, equipment, Utilities and Infrastructure Design, Qualification, Maintenance and Control
Facilities
Facilities Design
Facility design requirements (plant layout, air filtration, material of construction, cleanability, airlock design, logical and chronological activities flows )
4.1, 4.2, 4.3, 4.5, 4.6, 4.7,
4.8, 4.9
4.10, 4.11, 4.12, 4.13, 4.17
6.6
6.21
4.1 explain how controls and monitoring are scientifically justified and capable of evaluating the state of environmental conditions for cleanrooms, airlocks and pass-throughs used for material and equipment transfer
4.3 Barriers should be considered in the CCS. Any alternative approaches to the use of RABS and Isolators should be justified
Develop the current material transfer and airlocks sections using wording of 4.10, 4.11, 4.12, 4.13
To be filled out accordingly
To be filled out accordingly
HVAC system design requirements (Air Filtration/HEPA Filters, Pressure cascades, Temperature, RH, locations of air inlets outlets, ducts cleanability, air exchanges rates, alarms settings and controls ..)
4.13, 4.14, 4.15, 4.16
4.35
Develop an adequate section to cover 4.16 Setpoints and the criticality of pressure differentials should be documented within the CCS / where alarm delays are set, these should be assessed and justified within the CCS
To be filled out accordingly
To be filled out accordingly
Area Classification / Grade cascading
4.1, 4.4, 4.12, 4.13, 4.20
8.14
No gap identified
Physical segregation of activities (dedicated facility/area, use of closed systems, o
您可能关注的文档
- √ 01 Anwarul 基于ISPE GAMP5的计算机化系统验证生命周期实施.pdf
- CCS指南-附件2:CCS内容表的例子.docx
- CCS指南-附件3:污染控制策略文件的模板(示例).pdf
- CTD申报资料:创新药IND模块一--行政文件和药品信息.docx
- CTD申报资料撰写模板:模块三之3.2.P.4辅料的控制.docx
- CTD申报资料撰写模板:模块三之3.2.S.4原料药的质量控制.docx
- EMA:人用药品亚硝胺评估最终报告-2020年07月.pdf
- EMA-制药用水指南(中英文版).pdf
- EP各论中溶出度和崩解度测试的新政策 20201210.pdf
- FDA-21 CFR Part 820新版医疗器械质量管理体系法规(QMSR)征求意见稿(中文)-202202.pdf
文档评论(0)