GMDAEWOO标准化培训教材.pptVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Speaker’s Notes Say: If the chocolate factory had a drop in demand, and they didn’t adjust the cycle time of the workers, thean we have waste in the form of waiting time. Also, other problems can be hidden. Ask: Remember the part in the video where Ethel says, “No problem, I can do this,” in a very slow and exaggerated manner? Was there anything she didn’t know about when she made this statement? Ask: How do you think problems remain hidden when the cycle time is below the takt time? Ask: What is the difference between takt time and cycle time? Can anyone give me the definition for each? Speaker’s Notes Ask: When the manager at this chocolate factory arbitrarily decided to turn up the speed of the line, without any adjustments to the work cycle of Lucy and Ethel, this proved to be a disaster! If in fact the increased takt time were justified by demand, then the cycle time of Lucy and Ethel would have to be adjusted - otherwise the worker is overburdened! Documented, standardized work , can be adapted to necessary changes in takt time (e.g., based on demand), but these changes are pre-announced many months ahead of time, and only come infrequently (e.g., once or twice a year at most) with plenty of forewarning. This allows the company time to adjust standardized work in a structured and controlled way. The same is true for a drop in demand . . .show next slide Speaker’s Notes Ask: When the manager at this chocolate factory arbitrarily decided to turn up the speed of the line, without any adjustments to the work cycle of Lucy and Ethel, this proved to be a disaster! If in fact the increased takt time were justified by demand, then the cycle time of Lucy and Ethel would have to be adjusted - otherwise the worker is overburdened! Documented, standardized work , can be adapted to necessary changes in takt time (e.g., based on demand), but these changes are pre-announced many months ahead of time, and only come infrequently (e.g., once or twice a y

文档评论(0)

虾虾教育 + 关注
官方认证
文档贡献者

有问题请私信!谢谢啦 资料均为网络收集与整理,收费仅为整理费用,如有侵权,请私信,立马删除

版权声明书
用户编号:8012026075000021
认证主体重庆皮皮猪科技有限公司
IP属地重庆
统一社会信用代码/组织机构代码
91500113MA61PRPQ02

1亿VIP精品文档

相关文档