旋挖钻孔灌注桩施工方案施工组织设计.pdfVIP

  • 3
  • 0
  • 约4.26万字
  • 约 57页
  • 2023-04-12 发布于山西
  • 举报

旋挖钻孔灌注桩施工方案施工组织设计.pdf

目 录 TOC \o 1-2 \h \z 第一章 工程概况 ·····················1 1.1 拟建建筑概况 ·····················1 1.2 地质条件 ·······················1 1.3 场地条件 ·······················2 1.4 周边环境条件 ·····················2 第二章 工程设计要求及工作量 ···············3 2.1 工程设计技术要求 ···················3 2.2 工程设计工作量 ····················4 第三章 施工平面布置 ···················7 3.1 施工平面布置原则 ···················7 3.2 施工平面布置说明 ···················7 3.3 施工平面布置 ·····················9 3.4 施工顺 ·······················9 第四章 施工准备 ····················10 第 1 页 4.1 组织准备 ······················10 4.2 临时设施准备 ····················10 4.3 材料准备与试验 ···················10 4.4 技术准备 ······················11 4.5 施工机械及主要配套机具 ···············11 第五章 项目管理机构设置 ················13 5.1 现场组织机构设置及管理人员安排 ···········13 5.2 劳动力计划 ·····················15 第六章 施工计划 ·····················16 6.1施工方法选择及优势 ··················16 6.2 施工进度计划 ····················16 6.3 施工进度计划控制 ··················17 6.4 施工工期进度计划图 ··················18 第七章 钻孔灌注桩施工工艺 ··············20 7.1 钻孔灌注桩施工工艺的选择 ··············20 第 2 页 7.2 成桩质量保证措施 ··················26 7.3 成桩工序检查内容 ··················27 7.4 钻孔灌注桩施工应变措施 ···············28 第八章 后压浆施 艺 ·················28 8.1 概述 ························28 8.2 后压浆技术要求 ···················29 8.3 钻孔桩后压浆施 艺流程图 ·············29 8.4 钻孔桩后压浆技术措施 ················29 8.5压浆设备及材料 ····················31 第九章 工期保证措施 ··················31 9.1 工期管理措施 ····················31 9.2 关键工序进度保证措施 ················32 9.3 工期的奖罚办法 ···················33 9.4 工期承诺 ······················33 第十章 环境保护措施 ···················33 第 3 页 10.1 周边环境协调保护措施 ················33 10.2 施工中环保措施 ··················34 第十一章 质量保证措施 ·················36 11.1 质量目标 ······················36 11.2质量保证体系 ····················36 11.3 质量保证措施 ····················40 11.4 质量管理制度 ····················41 11.5 质量奖罚办法 ····················43

文档评论(0)

1亿VIP精品文档

相关文档