- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
混凝土管道施工方案
Project n: Rainwater and Drainage Pipeline Supplementary Project of a Public Auxiliary Facility
1.Basis of n:
a。Tender documents of the project;
b。Content of the project tender;
c。n of the project: City X。Province X;
d。n date: before year/month/day;
e。Quality: XXX documents;
XXX.
2.Project Overview:
The depth of the XXX 1.3m.
XXX XXX.
XXX pipe and the interface form is n.
3.n Plan:
a。XXX:
Measurement and layout -。Slotting and n -。Pipeline n -。XXX -。n of joint working pit -。Alignment -。Water or air tightness test -。Backfilling.
b。n XXX:
1.Before n。review the n drawings。XXX disclosure.
2.Before n。XXX een the plan n and n of XXX should be marked on the drawing after XXX.
3.The water pressure test of the pipe n。the mortar mix。and the best n test of the XXX.
XXX:
1.Measurement control and management:
The measurement control ork of the n site is measured and set up based on the benchmark points given by Party A。and the data is XXX.
XXX are high。Our company will strictly implement the n XXX to ensure accurate and high-quality engineering surveying。and usly implement the XXX Surveying Marks issued by the State Council。and establish regular and specific re-measurement。n。and XXX.
Self-XXX。the line and column lines and the centerline of the n should be measured to the top surface of the n。and the XXX。with named points。numbered lines。and data for XXX.
2.Measurement of plane control:
During n。the baseline control line should be determined uniformly according to the design drawings。and other control lines should be based on this.
XXX and temporary markers should be set up for the plane control points in the n area。The burial of permanent markers should consider long-XXX and n。XXX depth of the markers should not be less than 0.5m。and in frozen soil areas。the burial depth of the markers should not be less than 0.5m below the frozen soil line。The top of the marker should be 0.3m higher than the design n of the ground.
XXX wooden stakes。but can also be made of iron stakes