- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
农田输配电工程施工方案
The n Plan for Power n and n Project in Farmland
I。n of Trenches and Ditches
Hydraulic excavators will be primarily used for n。while manual labor will be utilized for clearing the ditch。During the n process。the soil quality and groundwater level will be regularly inspected and recorded。If the soil quality of the n is found to be different from the design or if any special circumstances arise。relevant personnel will be consulted to determine the best course of n and record it for future reference.
To prevent disturbance to the pit bottom。the exposure time of the n pit should be minimized as much as possible。If the next step of n cannot be carried out immediately。a covering layer of soil with a thickness of 15-30cm should be reserved and removed during the n n。The primary n requirements for soil n are as follows:
1) Detailed technical ns should be given before n。and n should be carried out according to the specified requirements.
2) Support is necessary during n pit n。The n and support should be coordinated with each other。After mechanical n。anchor rod support should be used in a timely manner to prevent instability of the pit wall and collapse.
3) During the n process。no soil should be piled arbitrarily around the n pit。After manual n reaches the design n。the n。design。quality n。survey。and n units should inspect the ditch to ensure that it meets the requirements before proceeding to the next step.
4) A dedicated person should be on duty during the n process。If any abnormal n is found。the project manager。design team。n team。survey institute should be notified immediately。and soil n should be ped until the cause is determined and measures are taken to resolve the issue.
5) After the n pit is excavated。drainage ditches should be constructed around the top of the slope to ensure smooth drainage。The stability of the slope should be checked regularly。Temporary or permanent drainage ditches should be set up within the n area to drain water to the lower area。and a
您可能关注的文档
最近下载
- 高标准农田建设项目初步验收报告、建设、施工管理、监理、设计、运行管.docx
- AfterEffects动态图形与动效设计 配套课件.pptx
- 2022最新版初中物理新课标学习解读培训可编辑课件.pptx VIP
- 2025年陕西榆林能源集团有限公司人员招聘笔试模拟试题及答案解析.docx VIP
- 22J603-1 铝合金门窗参考图集.docx VIP
- 2025年陕西榆林能源集团有限公司招聘笔试模拟试题及答案解析.docx VIP
- 黑布林阅读初二2《莫格利的兄弟》中文版.pdf
- 医学课件-脑梗死.pptx VIP
- 2025年陕西榆林能源集团有限公司招聘笔试备考试题及答案解析.docx VIP
- 微生物工程在金属冶炼废水处理中的应用.pptx VIP
文档评论(0)