履带式推土机的计算流程.pdfVIP

  • 0
  • 0
  • 约2.9千字
  • 约 4页
  • 2024-10-11 发布于河南
  • 举报

履带式推土机的计算流程

英文回答:

Thecalculationprocessofabulldozerwithtracks

involvesseveralsteps.First,theoperatorneedsto

determinethedesireddepthandwidthofthecutorfill.

Thisistypicallyspecifiedintheprojectplansor

instructions.Oncethedesireddimensionsareknown,the

operatorcanproceedwiththecalculations.

Thenextstepistomeasurethedistancethatthe

bulldozerneedstotraveltocompletethecutorfill.This

canbedoneusingameasuringtapeorbyusingthe

bulldozersbuilt-indistancemeasuringsystem.The

distancemeasurementisimportantfordeterminingthe

amountofmaterialthatneedstobemoved.

Aftermeasuringthedistance,theoperatorneedsto

calculatethevolumeofmaterialthatneedstobemoved.

Thiscanbedonebymultiplyingthewidth,depth,and

lengthofthecutorfill.Forexample,ifthedesiredcut

is10feetwide,5feetdeep,and100feetlong,thevolume

wouldbe10x5x100=5,000cubicfeet.

Oncethevolumeiscalculated,theoperatorneedsto

determinetheweightofthematerial.Thiscanbedoneby

usingthedensityofthematerial.Forexample,ifthe

materialissoilwithadensityof100poundspercubic

foot,theweightwouldbe5,000x100=500,000pounds.

Withthevolumeandweightdetermined,theoperatorcan

thencalculatethetimeitwilltaketocompletethecutor

fill.Thiscanbedonebydividingthevolumebythe

bulldozersproductionrate.Theproductionrateisthe

amountofmaterialthebulldozercanmoveinagiventime

period,typicallyexpressedincubicyardsperhour.For

example,ifthebulldozerhasaproductionrateof500

cubicyardsperhour,thetimetocompletethecutwouldbe

5,000cubicfeet/(500cubicyards/hourx27cubic

feet/cubicyard)=0.37hours.

Inadditiontothesecalculations,theoperatoralso

needstoconsiderfactorssuchastheterrain,weather

conditions,andanyobstacl

文档评论(0)

1亿VIP精品文档

相关文档