土方高回填防沉降措施.pdfVIP

  • 12
  • 0
  • 约3.71千字
  • 约 8页
  • 2024-10-13 发布于河南
  • 举报

土方高回填防沉降措施

##TechnicalMeasuresforPreventingSettlementofHigh

EarthBackfill.

1.ConstructionPreparation.

SoilCompactionControl:

Conductsoilcompactionteststodeterminethe

optimalcompactionmethodanddensity.

Useappropriatecompactionequipment(e.g.,

vibratoryrollers,platecompactors)toachievethe

requiredcompactionlevel.

Performfielddensityteststoverifytheachieved

compactiondensitymeetsthedesignspecifications.

FoundationReinforcement:

Iftheunderlyingsoilisweakorunstable,

文档评论(0)

1亿VIP精品文档

相关文档