Manufacturer’sweldingprocedure

specification(WPS)

Manufacturer’sWeldingProcedureReferenceNO:WPS-002-2014

WPQRNo:WPQR-002-2014

Manufacturer:YNLT

WeldingProcess:FCAW(Single-run/Multi-run)

JointType:T-Butt

WeldPreparationDetails(Sketch):Properlycleanbasemetalpriortoweldingwithinthe20mmof

theweld

MethodofPreparationandCleaning:Grinding

ParentMaterialSpecification:Q345E/Q345E(1.2-1.2accordingtoISO1566

MaterialThickness:δ = 30/30mm

Rangeofqualificationforsteelgro