挂蓝施工工艺简介幻灯片.pptVIP

  • 19
  • 0
  • 约 44页
  • 2017-09-28 发布于广西
  • 举报
建桥者用于小墩顶施工 When the pier head is too small to allow normal assembly of the Bridgebuilder, our patented Cross-member solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the above 4 phases. 第四步: 完成12米墩顶混凝土,可进行标准挂蓝施工 建桥者用于小墩顶施工 When the pier head is too small to allow normal assembly of the Bridgebuilder, our patented Cross-member solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the above 4 phases. 第四步 完成12米墩顶混凝土,可进

文档评论(1)

  • 用户头像 匿名 2012-02-22 19:06:46
    谢谢分享了!

1亿VIP精品文档

相关文档