- 19
- 0
- 约 44页
- 2017-09-28 发布于广西
- 举报
建桥者用于小墩顶施工 When the pier head is too small to allow normal assembly of the Bridgebuilder, our patented Cross-member solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the above 4 phases. 第四步: 完成12米墩顶混凝土,可进行标准挂蓝施工 建桥者用于小墩顶施工 When the pier head is too small to allow normal assembly of the Bridgebuilder, our patented Cross-member solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the above 4 phases. 第四步 完成12米墩顶混凝土,可进
原创力文档

文档评论(1)