网站大量收购闲置独家精品文档,联系QQ:2885784924

毕业论文;杨营煤矿设计.doc

  1. 1、本文档共222页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
摘 要 煤炭是我国在国民经济中占有重要的战略地位, 本课题针对的主要方向为矿井机电设备。要实现高产高效的采煤,必须进行正确的机电设备选型。介绍了矿井概况,包括矿井的煤层赋存情况,水文地质情况,矿井开拓方式,通风排水压气系统,运输提升系统,矿井供电系统和生产管理系统。 根据课题的设计要求,本设计主要从矿井地理位置,井田走向,顶底板条件,水文地质,矿井开拓系统,通风及排水要求,主副井系统,主运输系统等矿井基本情况出发,进行采煤机选型计算,乳化液泵站选型计算液压支架选型计算,刮板输送机选型计算,通风设备选型计算,排水设备选型计算,皮带输送机选型计算,主井提升设备选型计算。并绘制三机配套图,泵房布置图,。 关键词:矿井机械化;选型设计;设备配套;运输提升;通风排水 ABSTRACT Coal is Chinas most major one-time energy, China is the strategic most safe and reliable energy, in the national economy plays an important strategic position, its important strategic resource unassailable. Of coal in primary energy consumption structure in the world accounting for 20% or more, China is also typical of countries with less oil and more coal. This topic in the main direction for mine electrical equipment.To achieve high efficiency of coal mining, must be the correct selection of equipment. Overview of mine introduced, including the mines coal bed tax saves the conditinon conditions, hydrogeological conditions, coal-mining method, ventilation and drainage pressure gas system, improve transportation systems, power systems, and mine production management system. According to the design requirements issues, the design mainly from the mine location, Ida trend, roof and floor conditions, hydrogeology, mine development system, ventilation and drainage requirements, the main shaft system, the main transport systems of basic conditions of mine, for mining machine selection calculation, selection of emulsion pumping station hydraulic support selection calculation, scraper conveyor selection calculation, calculation of ventilation equipment selection, equipment selection drainage calculations, selection of belt conveyor calculation, the main shaft hoisting equipment selection Computing. And the mapping of Figure 3, and machinery, pump house floor plan, main shaft hoisting equipment, electric control plan. Key words: shearer; conveyor; belt conveyor; drainage and ventilation; hydraulic support; mine hoist 目录 1 矿井概述 1 1.1矿

文档评论(0)

***** + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档