阳煤集团寺家庄公司400万吨井型设计.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
专 业: 采 矿 工 程2004-4  设计题目:阳煤集团寺家庄公司400万吨井型设计 专 题: 煤与瓦斯突出的现状及分析 摘 要本设计包括三个部分:一般部分、专题部分和翻译部分。 一般部分为新井设计。井田工业储量为t,矿井可采储量t。矿井服务年限为,最大涌水量为m3/h。矿井瓦斯涌出量较,为瓦斯矿井。 井田矿井年工作日为30d,工作制度为“”制。一般部分共包括10章:1.矿区概述及井田地质特征2.井田境界和储量3.矿井工作制度及设计生产能力、服务年限4.井田开拓5.准备方式区巷道布置6.采煤方法7.井下运输8.矿井提升9.矿井通风与安全技术10.矿井技术经济指标。ABSTRACT This design consists of three parts: the general part, the special part and translated part. The common part is the positive coal group temple village 4,000,000 ton well new well design..The temple village ore is located within the boundaries of Xiyang County, the geographical position is superior, the transportation is convenient, this well field assumes a monoclinal structure basically, the structure complex degree medium.The well field moves towards for the northwest, inclines to the southwest, the stratum quite is gentle, inclination angle generally for 5°~10°.In this well field altogether contains coal 18, from the top downward may pick and may mine coal partially the level to have 6, 81, 84, 9 and 15 coal beds, the total thickness reaches 9.9m.15 coal entire area stable may pick, for mainly may mine coal the level, also is the first mining coal level, greatest thickness 7.65m, average thickness 5.48m. The proved reserves of the minefield are 683.36 million tons. The recoverable reserves are 422.72 million tons. The designed productive capacity is 4 million tons percent year, and the service life of the mine is 75 years. The normal flow of the mine is 240 m3 percent hour and the max flow of the mine is 350 m3 percent hour. The mineral well gas gushes the deal higher, for high gas mineral well. The field has been divided one mining levels. The first level should be located at the lever of 510 m, The mine pit uses sets up the synthesis development plan slanting.In order to save the initial period well lane resilience, reduces the investment, the production panel centralism arrangemen

文档评论(0)

追风少年 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档