网站大量收购独家精品文档,联系QQ:2885784924

盾构隧道施工地表变形分析与三维有限元分析----外文翻译.doc

盾构隧道施工地表变形分析与三维有限元分析----外文翻译.doc

  1. 1、本文档共26页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Surface deformation analysis of shield tunnel construction and three-dimensional finite element analysis YuningZhuhehua(TongjiUniversity) Abstract: With the increasing density of landmark buildings, the subway construction process on the ground worried about the environmental protection is a growing problem can not be ignored. Shield tunneling technology successfully used in subway construction, how reasonable prediction and control of shield construction of the surface deformation as a new topic. In the basis of an extensive literature, summarized previous calculation method, the finite element method of shield tunnel deformation of three-dimensional finite element simulation, compared with the measured data are more satisfied with the results. Key words: tunnel, ground deformation, three-dimensional finite element analysis 1.Facebook: After the introduction of shield tunnel with a century of development, while significant development, but inevitably lead to formation of the disturbance caused by ground deformation and land subsidence, especially in the shield tunnel in soft soil particularly. Disturbance lead to soil disturbance led to the strength and modulus decrease will lead to a long consolidation and secondary consolidation settlement. Deformation over a range of local level, it will seriously endanger the adjacent buildings and the safety of underground pipeline network, causing a series of geotechnical problems. Thus, the construction of the shield around the formation mechanism of disturbance is significant. Shield Tunnel Construction on a major analysis of surface settlement factor: Shield Tunnel Construction on a major analysis of surface settlement factors a number of successful experience at home and abroad;resulting in surface subsidence due to shield formation damage created during the construction caused ground movement, caused by shield construction of ground movement of factors:

文档评论(0)

嫣雨流纱 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档