- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
E2483Environmental Assessment Summary ReportforJiangsu Wuxi Tai Lake Environment ProjectChina Research Academy of Environmental SciencesMay 2010 Table of Content1. General Introduction31.1 Project Background31.2 EA Basis31.3 Applicable Standards41.4 Methodology of EA41.5 Assessment Coverage51.6 General Framework of Environmental Impact Assessment Report52. Project Description53. Environment Baseline73.1 Natural Environment73.2 Socio-economic Condition83.3 Currrent Environment Quality84. Prediction and Assessment of Environmental Impact94.1 Environmental Impact Assessment in Construction Period94.1.1 Water Environment94.1.2 Solid Waste Impact104.1.3 Impact on Ecologic Environment114.1.4 Impact on Ambient Air114.1.5 Impact on Acoustic Environment114.2Environmental Impact during Operation Phase114.2.5Sludge Disposal Impacts124.3Environmental Risk Assessment134.4 Environmental Mitigation Measures145.Analysis of Alternatives175.1 Introduction175.2Wastewater Treatment Process Options176Resettlement Action Plan and Social Impact Analysis176.1Resettlement Plan176.1.1 Land Acquisition and Resettlement176.1.2 Resettlement and Compensation program186.1.3 Resettlement Cost Estimate196.2Social Impacts Assessment197 Environmental Management Plan197.1Institutional Arrangement197.2Environmental Monitoring Plan197.3Environmental Budget238 Public Consultation and Information Disclosure248.1Public Consultation248.2Information Disclosure259 Conclusions251. General Introduction1.1 Project Background This project consists of Changguangxi wetland rehabilitation works, Huishan fourth phase wastewater treatment and re-use works, dredging works in Meiliang Lake, and several non-physical components related to environmental management. These works are all located within the Wuxi part of the Tai Basin. The Tai Basin is located within the Yangtze River Delta and has a total catchment area of 36,900km2. The basin is experiencing rapid economic development while still facing severe challenges in
文档评论(0)