罗普斯金issue_ts045migo收货报ki235和c+099错误.docVIP

罗普斯金issue_ts045migo收货报ki235和c+099错误.doc

  1. 1、本文档被系统程序自动判定探测到侵权嫌疑,本站暂时做下架处理。
  2. 2、如果您确认为侵权,可联系本站左侧在线QQ客服请求删除。我们会保证在24小时内做出处理,应急电话:400-050-0827。
  3. 3、此文档由网友上传,因疑似侵权的原因,本站不提供该文档下载,只提供部分内容试读。如果您是出版社/作者,看到后可认领文档,您也可以联系本站进行批量认领。
查看更多
MIGO收货报KI235和C+099错误 作者:高林旭 一、问题现象 在做MIGO对订单收货时,系统出现错误。 In Quantity view, Qty in unit of entry field, enter 50, UOM is EA.(Note: You should enter only 50 so that you can see the error message, not 40 nor other qty. In another order 40 and 100 EA can be posted.) In Where view, storage location = 0002, Reason for movement = 1000. In Batch view, batch = A01 点击check, 继续,点击post, 帮助文件显示: Accountrequires an assignment to a CO object Message no. KI235 Diagnosis You have not defined a CO account assignment for an account that is relevant to cost accounting. System response Accountis defined as a cost element. This means that you must always specify a CO account assignment. Procedure Enter one of the following CO account assignments ……. 继续,再次点击post或保存图标,系统又报如下错误: 帮助文件显示: Internal error in FORM/FUNCTION convert_transaction_quantity(saplckmo) in position 3 with RC Message no. C+099 Procedure Please inform your system administrator. 二、问题测试分析 按照SAP提示,给成本要上成本中心G001, 再次输入上述信息, 点击Check,系统出现: 忽略,继续, Status changed: missing values for required chars in L210106180 ?????? A01 Message no. CL500 Diagnosis You want to save an allocation to a class with released status. However, the class contains characteristics for which an entry is required. System response The system changes the status of the allocation to incomplete. Procedure If you want to save the allocation with released status, first you must assign values to all the required characteristics. Then you can set the status you require. Note The classification status affects functions such as the find objects function. You can define whether objects with incomplete classification status are included in the search result. If the classification status of a configurable material is incomplete for an allocation to a class, this does not affect configuration. 此时,凭证已经过账,显示会计凭证: 转到生产订单显示界面,成本趋势显示如下结果: 在物料主数据中,物料的标准成本为:61,761.67/1000EA: 由此推测前面产生的凭证逻辑为: Dr: 原材料-铝棒 3,088.08 = roun

文档评论(0)

文档集锦 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档