尤尼佳SUC_MC_MM_Meeting minutes_030731_V4_EN.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Meeting Minutes Date: July 29, 2003 Time Starting 9:50 Time Ending 16:50 Location: Factory Attendance SUC Zhang Yongke, Chen Jiale, Li Hong, Li Wen, Yin Hongfang, Wang Hailin, etc. MC Lin Fang, Xiang Hongzhi, Xia Hao, Initiated by: Xia Hao Revised by: Lin Fang Topic: Item Subject MM 1.0 Purchasing Plan MM 2.1 Raw Material Purchasing MM 2.2 Parts Purchasing MM 2.3 Vendor Return MM 2.4 Subcontract Purchasing MM 3.1 Goods Issue for production MM 3.2 Goods receipt from production MM 3.3 Stock transfer from factory to DC MM 3.6 Other Transfer posting MM 4.1 Physical Inventory MM 4.2 Material Price adjustment MM 5.0 Balance sheet valuation Confirmed Points: Item Confirmation MM 1.0 Material Requirement list will be prepared based on production plan made and raw material inventory. The purchasing plan will be made monthly and on rolling basis. MM 2.1 The prerequisite for raw-material purchase process is that bar-code system will not provide purchase order management functionality. Purchase orders need to be printed out for approval. Purchase orders may be changed after vendor confirmation. The delivery schedule will be confirmed on weekly basis. The purchasing process for SUC is as same as that for UCCP. The purchase order for UCCP will be separated from that for SUC. The invoice entry in R/3 should be confirmed in advance, and the invoice that arrives before goods’ arrival will not be input in the R/3 until goods arrival. Sanitary and baby product do not share any raw material. The gift raw material from vendor will be managed in inventory in future. MM 2.2 The purchase requirement for parts is based on department requisition or the reorder point control. The purchasing process and release strategy for parts is similar to that for raw material. The existing material coding rule for parts is: catergory(2) + bin number+sequence(3) Bar-code system will not to manage parts inventory in short term. Fix-assets purchasing will not be included in t

文档评论(0)

文档集锦 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档