- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Issue List
Item Issue PIC Deadline GL-3.2.1 Monthly Closing, Consolidation HQ
Cash Flow Chart
We’ll discuss further about how to create China cash flow chart.
Closing Date
AS IS: the last day the month.
TO BE: After integration with R/3, whether we have to bring the closing date forward about two days should be discussed with SD.
Goods issue to cost center
When goods issue to cost center, it’ll have many accounts to transfer the expense. It’ll be discussed further whether we’ll use the SAP function—movement type to transfer automatically or use the middle account.
Zhu Limin
Zhou Qian
Zhou Qian,
Hua Wenye 2003/7/29 GL-3.4 Master Data Maintenance
We suggest master data which is related with vendors’ and customers’
data should be maintained by IS department Zhou Qian 2003/7/29 AP-1.1 (1) Parts Management
AS IS: The factory manages the parts by Excel without codes.
TO BE: SUC wants to do the parts management in R/3 just as material management. But the parts code and price are necessary to provide, so as to input them into system. We suggest in system using moving average method to control the parts price, as the price won’t have a big change. Ishikawa 2003/8/5 AP-1.3 Payment Approval
(1) The blocked AP should be reversed by which department, which should be discussed further. Aoyama 2003/7/28 AP-1.6 Bank Remittance and Confirmation
(1) TO BE: Cashier will download payment data from SAP to “Piao Ju Tong” system to print the bank remittance, but whether the interface between Piao Ju Tong and R/3 is possible or not should be confirmed by the software vendor and ABAP developer. Wang Lin 2003/7/28 AP-1.7 Check Management
(1) TO BE: Payment data which use check payment will be downloaded from SAP to Piao Ju Tong, after printing the check, the data will be uploaded to SAP to update the check management data. Whether the interface between Piao Ju Tong and R/3 is possible or not should be confirmed by the software vendor and ABAP developer. Wang Lin 2003/7/28 CO 5.0 P
您可能关注的文档
- TCL ERP项目FIAR0002-内蒙和新技术的数据上载.doc
- TCL ERP项目批次排产差异表.doc
- 扬子石化Status Report_PM_20031225.doc
- TCL ERP项目远期关键物料需求报表FUNCTIONAL SPEC.doc
- tcl erp项目销售订单欠料查询系统-周大辉支涛确认.doc
- 扬子石化Status Report_PM_20040108.doc
- 富大集团ERP项目FI操作注释.doc
- 百事SAP实施BPP_CO_KO25 显示补充预算.doc
- 扬子石化Status Report_PM_20040205.doc
- 江西石油Asis analysis_FICOTR_GX_v6.doc
- 大连重工SD-020-产品主数据维护管理制度.doc
- 太原钢铁erp_pp_会议纪要_现状调研加工厂_20050718v2.doc
- 尤尼佳SUC_MC_Meeting Minutes_20030723B.doc
- 科龙浙江分公司送两台空调给杭州科龙帐务如何处理.doc
- 大连重工SD-050-分包合同维护管理制度.doc
- 太原钢铁erp_pp_会议纪要_现状调研新炼钢厂_20050726v2.doc
- 江西石油memo_SA_MM_IC卡的上线方案_060523_1.2.doc
- tcl erp项目陆运进口流程hk、福田.doc
- 大连重工单元测试-fi060-应收预收帐款处理.doc
- 太原钢铁ERP_SD_库房管理及发运调研会议纪要_20050627V1.doc
文档评论(0)