顶管上穿施工对已有区间隧道影响性分析.pdfVIP

  • 7
  • 0
  • 约9.4千字
  • 约 4页
  • 2017-09-14 发布于安徽
  • 举报

顶管上穿施工对已有区间隧道影响性分析.pdf

1 何庆萍 ( , 200070) : , ; , , ANSYS , : ;; ; ANALYSISOFINFLUENCE DUE TO PIPE JACKING TRAVERSINGSUBWAYTUNNEL He Qingping (ShanghaiGas Engineering Design and Research Institute Co.Ltd, Shanghai200070, China) Abstract: The neighborhood andtunnel will be damaged by movements of soil induced by pipe jacking. While 库 jacking, the groundupheavalandsettlement must be controlledstrictly; at thesame time thedeformationand floating of the tunnelmust be controlled. Considering the coupled action of soil, subway tunnel, pipe jacking 例 driving, with software of ANSYS, a three dimensional finite element method is used to analyze the displacements of subway tunnelcaused by pipe jacking traversing construction,and some technology methods areproposed. 案 Keywords: pipejacking driving; traversing construction; tunnelfloating; three dimension FEM analysis E A 0 C, , 31 600 m, 1200, , 11 1m;, 模 - 111 860 m,61 56 m , , 楷 , , , 12 O , , E [1-5] , M A [6] C 2 , 1) : , ; 2) : ? 5mm 3) :

文档评论(0)

1亿VIP精品文档

相关文档