July 17-18, 2001International Aircraft Systems FireProtection.ppt

July 17-18, 2001International Aircraft Systems FireProtection.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
July 17-18, 2001International Aircraft Systems FireProtection.ppt

AAR-422 Fire Safety RD* Scale Model Inerting Testing ___________________________________ July 17-18, 2001 International Aircraft Systems Fire Protection Working Group Wilson, NC Scale Model InertingTesting with 1/4 Scale Boeing 747 SP Fuel Tank Background Inconsistent Comparisons of Test Data Created Questions of NEA Required to Inert an Aircraft Center Wing Tank Focus of the Testing is to Better Determine the Best Method to Inert a Compartmentalized Fuel Tank Study Equal NEA Distribution and Localized NEA Deposit Study Cross-Vented and Single Vent Configurations Develop Methods to Make Fair Comparisons. Test Article Quarter Scale Model of Boeing 747 SP CWT was Built from Plywood By Scaling Drawings from Shepherd Report 24% length Scale (1.2% Volume) Scaled all Bay-Bay Penetrations “Variable Manifold” Allows for Depositing NEA in Any and All Bays of the Tank at Different Rates to Support Inerting Times as Low as 10 Minutes Oxygen Sensor in Each Bay and in One Vent Channel Scale Model Bay Convention Dry Bay 1 2 3 4 5 6 Preliminary Balanced Data Inerted Tank Several Times with NEA 95% and NEA 98% with the Goal of Balancing the Flow into Inert Each Bay “Equally” for Standard Cross-Venting Configuration Acquired Data with a Stop Watch (1 reading per minute) Developed a Volumetric Average to Make Comparisons with Other Inerting Runs Results As Expected and Consistent with Previous Testing but New Numbers Point Toward a VTE of 1.6 for 95% NEA VTE Very Sensitive to O2 Concentration at 8% for 95% NEA Preliminary Balanced Inerting Data Preliminary Balanced Weighted Average Data Preliminary Unbalanced Data Inerted Tank Several Times with NEA 95% with the Goal of Minimizing the Volume Required to Inert the Tank with Standard Cross-Venting Configuration Acquired Data with a Stop Watch (1 reading per minute) Used the Volumetric Average Developed to Make Fair Comparisons with Other Inerting Runs Results Illustrated Very Little Improvement in VTE Required, but Al

文档评论(0)

zhaoxq + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档