- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
1_04063-检查表 A755 requirements_ms_matrix (Issue 1).doc
Instruction for completing the check sheet
Part of the evidence required to be retained by your certification body to allow your certification to ISO/TS 16949:2002 includes the evidence that all the requirements of ISO/TS 16949:2002 are addressed in your quality management system.
Please complete the following checklist identifying your processes into the categories of; Customer Oriented - Support Oriented and Management. Identify against each of your processes the relevant element of the standard that is covered by that process by entering an X in the box. Please ensure that all elements have been covered and identified to the relevant process.
ORGANIZATION DETAILS
Manufacturing Site
Company Name Street Address City State Zip Code Country
Remote Support Location Remote Support Location
Company Name Company Name Street Address Street Address City City State Code State Code Country Country
Main Contact Name Phone# email Date Planned for stage 1 Audit Multi Site (Corporate) certificate If Multi Site # of sites Please supply diagram of corporate structure showing all sites, remote support locations and activites Customers Supplied from Site:-
Customer Supplier Code Customer Supplier Code Customer Supplier Code Customer Supplier Code
ISO/TS 16949:2002 Requirement Customer Oriented Processes Management/ Support Porcesses 4 Quality Management System 4.1 General requirements 4.1.1 General requirements - supplemental 4.2 Documentation requirements 4.2.1 General 4.2.2 Quality manual 4.2.3 Control of documents 4.2.3.1 Engineering specification 4.2.4 Control of records 4.2.4.1 Records retention 5 Management responsibility 5.1 Management commitment
您可能关注的文档
- 0_客户服务规范与技巧(适用于呼叫中心).doc
- 0_小区电梯使用管理规定.doc
- 0_小学六年级信息技术上册备课教案【绝版经典,一份非常好的参考教案】 .pdf
- 0_小学数学8.doc
- 0_小学数学知识点汇总.pdf
- 0_小金库专项治理工作总结.pdf
- 0_山东省建筑工程消耗量定额解释9976241899.doc
- 0_山西建滔潞宝30000m3气柜施工方案.doc
- 0_山西某某大型煤矿安全操作规程汇编(全套)【含166项安全操作规程,一份实战派经典参考资料】 .pdf
- 0_岩滩升船机主驱动电机容量的计算分析.doc
- 1_10%120可湿性粉剂生物农药生产高技术产业化项目资金申请报告.doc
- 1_158-上海世博会阿联酋国家馆钢结构施工关键技术.pdf
- 1_174-幼教国培学员阅读参考书目.doc
- 1_178-江苏省十二五”天然气发电规划.doc
- 1_2.模板施工技术及设计方法.doc
- 1_2000-2007年导航、气象及海洋专用仪器市场评估及2010年综合预测报告.pdf
- 1_2000t综合利用电石渣水泥熟料生产线可行性研究报告.doc
- 1_2005年个人工作总结(项目经理) .doc
- 1_2006年全国一级建造师执业资格考试《建设工程法规与相关知识》试题及解析.doc
- 1_2010年4月自考组织行为学重点学习笔记.doc
文档评论(0)