加筋土挡墙的设计程序开发及应用06823[鞠].docVIP

加筋土挡墙的设计程序开发及应用06823[鞠].doc

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
加筋土挡墙的设计程序开发及应用06823[鞠],加筋土挡土墙,加筋土挡土墙图片,加筋土挡土墙设计,加筋土挡土墙图集,加筋土挡墙工程图集,加筋土挡土墙设计规范,加筋土挡土墙施工方案,加筋土挡土墙工程实例,加筋土挡土墙设计图纸

The Design for Reinforced Earth Retaining Wall and the Exploitation and Application of its System Program Abstract: Based on the basic principle and method of the calculation for reinforced earth retaining wall and the earth pressure coefficient, the process of the project and calculation is realized by the language of FORTRAN in the computer, and the system program is used in a slope treatment project in Guangzhou. Comparing with the design method of the traditional regulations, it is showed that the optimum length required is obtained, the cross section and length of bars are fully used, and the design is simplified. Keywords: Reinforced earth retaining wall Project and calculation Computer system program Practical application 1. Introduction Reinforced earth retaining wall is composite structure composed of backfill, reinforcing bars and wall panel. Friction between soil and bars enhances the reinforced earth retaining wall strength, improves its physical behavior and reinforces soil cohesion. [1]Based on the specification, system program is exploited to apply reinforced earth retaining wall design by the language of FORTRAN in the computer. The relationship between physical behavior and cross sections of bars, length and layer of bars is considered by synthesis. Not only cross sections and length of bars are fully used and optimized, but the external stability of retaining wall is reinforced accordingly. The questions of the traditional design method are avoided. In the traditional regulation, firstly, the wall section is assumed; secondly, the reinforcement of bars are calculated, the cross section and length of bars are gained. In this way, the haul-resistant coefficient of the top wall is not enough, but it goes beyond at the bottom of retaining wall. The quantity of used bars is excessive. 2. [1, 2] Design for reinforced earth retaining wall 2.1 Basic assumption (1)The interface between activity area and stability area in the reinforced body i

文档评论(0)

tianma2015 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档