2016 A Heuristic Scheduling Algorithm for Multi-stage Job-shop Process with Crane Handling.pdfVIP
- 6
- 0
- 约 14页
- 2018-03-29 发布于河南
- 举报
2016 A Heuristic Scheduling Algorithm for Multi-stage Job-shop Process with Crane Handling.pdf
Journal of the Operations Research
Society of Japan 2006, Vol. 49, No. 3, 188-201 A HEURISTIC SCHEDULING ALGORITHM FOR STEEL MAKING PROCESS WITH CRANE HANDLING Takashi Tanizaki Takayoshi Tamura Hideaki Sakai Yutaka Takahashi Taichi Imai Sumitomo Metals Nagoya Institute Kyoto University Canon System Kokura , Ltd. of Technology Solutions Inc. Received July 1, 2005; Revised March 27, 2006 Abstract There are a large number of multi-stage job-shop processes in production plants. Steel making
process is also modeled as of a multi-stage job-shop process with crane handling. In the steel making
process if there are two or more overhead traveling cranes for material handling in a house, it becomes
very di?cult to obtain in practice an optimal or near optimal solution under consideration of restrictions
concerning crane interference caused between them as well as many restrictions for each facility in the house
of production plant. In this paper, we ?rst present a formulation of the scheduling problem taking account
of the crane interference and then propose a heuristic algorithm to ?nd a sub-optimal solution which starts
at feasible solutions and solves the problem in a ?nite time. The algorithm is characterized by restricting
search space and using hybrid method of depth-?rst search and width-?rst search on an enumeration tree
for crane assignment. We also discuss an availability of this algorithm using a numerical simulation for a
practical steel making process. Keywords: Algoritm, logistics, manufacturing, scheduling, simulation
1. Introduction
In the Japanese industry, recent customer demands require high quality, quick delivery and
large variety in products. In the situation the production scheduling has become more
important in order to achieve an e?cient operation, i.e. to minimize production cost and
production lead-time. However in some plants it is di?cult to
您可能关注的文档
- !secure-vehicular-communication-system-vanet-security-cm1.pdf
- (1小时学会C语言51单片机)C语言入门教程____2016下载.doc
- (Chinese)DB2+DPF-HA.ppt
- (CMR - Hau Lee) Aligning Supply Chain Strategies with Product Uncertainties.pdf
- (Communication+English)通信与信息工程专业英语教程[习题解答].doc
- (CSF) Dilute Sulfuric Acid Pretreatment of Corn Stover in a Pilot-Scale Reactor.pdf
- (CSF) Fractionation of lignocellulosics bysteam-aqueous pretreatments [and discussion.pdf
- (CSF)Pretreatment-Catalyst Effects and the combined severity parameter.pdf
- (ebook) - Physics - Tesla - How To Make Tesla's Coil.pdf
- (麻省理工2016课程)C语言内存管理和C++面向对象编程_lec01.pdf
- 《GB/T 21561.1-2025轨道交通 机车车辆 受电弓特性和试验 第1部分:机车车辆受电弓》.pdf
- 《GB/T 6346.2301-2025电子设备用固定电容器 第23-1部分:空白详细规范表面安装金属化聚萘二甲酸乙二醇酯膜介质直流固定电容器 评定水平EZ》.pdf
- 2026年中国城市建设史复习题200道含答案(基础题).docx
- 2026年注册会计师(CPA)考试题库200道及1套参考答案.docx
- 60103交通事故案卷文书 标准 ga 40-2018.pdf.pdf
- 小升初衔接第一讲:基础词汇与句型综合梳理与运用(基于Starters 14).docx
- 四级公路设计关键要素教学课件.pptx
- Unit7SectionA2a-2e课件鲁教版英语六年级下册.pptx
- 初中地理八年级:探秘台湾省环境与经济协同发展.docx
- Unit2Success单元重点单词单句写作练习课件-北师大版高中英语选择性(1).pptx
原创力文档

文档评论(0)