《2016 An efficient priority rule for scheduling job shops to minimize mean tardiness》.pdf

《2016 An efficient priority rule for scheduling job shops to minimize mean tardiness》.pdf

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《2016 An efficient priority rule for scheduling job shops to minimize mean tardiness》.pdf

IIE Transactions (2006) 38, 789–795 Copyright C “IIE” ISSN: 0740-817X print / 1545-8830 online DOI: 10.1080/07408170600710523 An efficient priority rule for scheduling job shops to minimize mean tardiness MICHAEL X. WENG∗ and HAIYING REN Department of Industrial and Management Systems Engineering, University of South Florida, Tampa, FL 33620, USA E-mail: weng@eng.usf.edu Received June 1999 and accepted October 2005 The ability to respond quickly to customer demands is a key factor in successfully competing in today’s globally competitive markets. Thus, meeting due dates could be the most important goal of scheduling in many manufacturing and service industries. Meeting due dates can naturally be translated into minimizing job tardiness. In this paper we present a priority rule for dynamic job shop scheduling that minimizes mean job tardiness. The rule is developed based on the characteristics of existing dispatching rules. With job due dates set by the generalized total work content rule, the computational results of simulation experiments show that the proposed dispatching rule consistently, and often, significantly outperforms a number of well-known priority rules in the literature. The proposed rule is also robust being the best or near-best rule for reducing the mean flowtime, for all the shop load levels and due date tightness factors tested. 1. Introduction For the reasons given above, we use the minimization of the Mean Tardiness (MT) as the scheduling objective. The Increasing global competition is forcing manufacturing and minimization of MT has been used as the primary objec- service companies to focus on producing high quality goods tive in scheduling job shops in order to meet job due dates at a low cost and being able to quickly respond to fluctu- (Conway e

文档评论(0)

wgvi + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档