- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
(liangron)英语考试历年试题--整理后
[1a] Management guarantees that the old system will be replaced and to consider the new proposal.
[1b] Management guarantees that the old system will be replaced and that the new proposal will be considered.
[2a] Use the cylinder with a diameter of 33/16 inches and 11/2 inches high.
[2b] Use the cylinder with a diameter of 33/16 inches and a height of 11/2 inches.
[2c] Use the cylinder that has a diameter of 33/16 inches and a height of 11/2 inches.
[3a] A successful firm is capable of manufacturing a product, marketing it, and make a profit.
[3b] A successful firm is capable of manufacturing a product, marketing it, and making a profit.
[1] The memo was sent by the manager.
[2] The manager sent the memo.
[1] Any loose bubbles can be detected in this way.
[2] You can detect any loose bubbles in this way.
[3] The worker can detect any loose bubbles in this way.
[1] The heated water is sent into the chamber.
[2] The heated water flows into the chamber.
[1a] The robot is used in repetitive activities.
[1b] Companies use robots in repetitive activities.
[2a] The ink is forced through the stencil by a squeegee.
[2b] A squeegee forces the ink through the stencil.
Incident Report
Date: May 16,2004
To: Tom Warner
From: Carlos Sandia
Subject: REPORT ON CHILLED WATER LEAKS IN D/823
Introduction
On May 15,2004, a flood was reported in D/823. I was called in to repair this leak. The following is a report on my findings and maintenance activities.
Discussion
Agenda
8:15 p.m. The flood was reported.
8:25 p.m. I arrived at D/823 and discovered that the water level in the expansion tank at HVAC unit 44 253R -01 was 4 feet above normal and the tank valve was open.
8:30 p.m. A second flood was reported at HAVC unit 44 937 -01 in the same department.
8:35 p.m. I shut off the open tank valves.
9:00 p.m. The expansion tank levels and pressure returned to normah
9:30 p.m. All leaks were secured.
Conclusion
The chilled water leaks were
您可能关注的文档
最近下载
- 2009石油化工行业检修工程动工预算定额说明.docx
- YB∕T6294-2024 锌铝合金镀层弹簧钢丝(报批稿).pdf VIP
- TSGZ6001—2019特种设备作业人员考核规则正文.pdf VIP
- 新湘教版七年级数学上册全册导学案.pdf VIP
- 2025年内蒙古自治区呼和浩特市初一新生入学分班考试真题含答案.docx VIP
- 2025年西藏高考理综真题试卷及答案.docx VIP
- 部编人教版一年级数学上册全册教案.docx VIP
- 超市经营服务方案.docx VIP
- 腐蚀数据与选材手册-校对版.xls VIP
- 六年级下册语文试卷-《金色的鱼钩》一课一练(含答案)人教部编版.pdf VIP
文档评论(0)